|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/5/2014 Measured TD: 14779 ft. Vertical TD: 7345 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/5/2014 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/6/2015 | | Proposed Top PZ Location: | Sec:5 Twp: 2n 67w | Footage: 2276 FNL 1948 FWL | | Bottom Hole Location: | Sec:32 Twp: 3n 67w | Footage: 460 FNL 1950 FWL | | Proposed Depth/Form: | 14764 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7676 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 434, Top: 500 ft., Bottom: 7676 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14764 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 281, Top: 7376 ft., Bottom: 14764 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/14/2014 | | Spud Date: | 1/30/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 14779 ft. | Measured PB depth: | 14764 ft. | | True Vertical TD: | 7345 ft. | True Vertical PB depth: | 7345 ft. | | Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2209 FNL 1883 FWL | | Bottom Hole Location: | Sec:32 Twp: 3N 67W | Footage: 524 FNL 1521 FWL | | Log Types: | CBL/MWD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 108 ft., Weight: 65.0 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 849 ft., Weight: 40.0 , Citings Type: ACTUAL | | Cement: | Sacks: 334, Top: 0 ft., Bottom: 849 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7765 ft., Weight: 26.0 , Citings Type: ACTUAL | | Cement: | Sacks: 609, Top: 25 ft., Bottom: 7775 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14767 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 535, Top: 6765 ft., Bottom: 14779 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7068 ft. | 7150 ft. | | | | NIOBRARA | 7151 ft. | 7546 ft. | | | | FORT HAYS | 7547 ft. | 7633 ft. | | | | CODELL | 7634 ft. | 14779 ft. | | |
Formation CODL Formation Classification: OW Status: PR - 11/5/2014 Interval Top: 7783 ft. Interval Bottom: 14717 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/29/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/11/2014 | Treatment End Date: | 8/27/2014 | | Treatment Summary: | Stage 1 - Stage 47 treated with a total of: 4,547,174 40/70 Sand proppant. | | Total fluid used in treatment (bbls): | 112644 | Max pressure during treatment (psi): | 8619 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 47 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 17931 | Total flowback volume recovered (bbls): | 2100 | | Fresh water used in treatment (bbls): | 94713 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4547174 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7430 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 552 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 552 | | CALC_GOR | 524 | | CALC_MCF_GAS | 289 | | CASING_PRESS | 2075 | | GRAVITY_OIL | 50 | | MCF_GAS | 289 | | TUBING_PRESS | 1329 |
| | Perforation Data: | | Interval Top: | 7783 ft. | # Of Holes: | 1243 | | Interval Bottom: | 14717 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 365 |
| Total Gas Produced (MCF) | 10595 |
| GOR | 29027 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.991 |
| Average MCFE per Day | 34.746 |
| Federal Financial Assurance | i | |
|
|