Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37770
Well Classification: OW Status: PA - 3/11/2024
Well Name/No:PENNINGTON #28N-2HZX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/11/2024
FacilityID:433775LocationID:331621
County:WELD #123Location:SWSE 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4861 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:672FSL  2317 FELLat/Long: 40.161619 / -104.856716Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.161619 / -104.856714Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #01
Start Date: 1/23/2014
End Date: 1/27/2014
Reported: 3/20/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification:              Status: AB - 8/13/2014             Measured TD: 8112 ft.    Vertical TD: 7164 ft.

 Wellbore Data for Original WellboreWellbore Classification:         AB - 8/13/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/3/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 1101 FSL  2328 FEL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 1101 FSL  2328 FEL
Proposed Depth/Form:11814 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7552 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7552 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6553 ft., Depth: 11814 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:10/21/2013Spud Date Is:ACTUAL
Measured TD:8112 ft.Measured PB depth:0 ft.
True Vertical TD:7164 ft.True Vertical PB depth:0 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 1101 FSL  2328 FEL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 1101 FSL  2328 FEL
Log Types:This well was a sidetrack. All logs will be submitted with final form 5 "01".
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 387, Top: 0 ft., Bottom: 1031 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7645 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 75 ft., Bottom: 7645 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6570 ft., Depth: 11763 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 6583 ft., Bottom: 11763 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 0 ft., Depth: 8112 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC

Formation NBRR                     Formation Classification:                       Status:  AB - 8/13/2014

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
No Perforation Data was found for formation NBRR.

Sidetrack #01             Wellbore Classification: OW             Status: AB - 3/11/2024             Measured TD: 11763 ft.    Vertical TD: 7184 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        AB - 3/11/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/15/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 623 FSL  2350 FEL
Bottom Hole Location:Sec:2 Twp: 2N 67WE Footage: 460 FNL  2370 FEL
Proposed Depth/Form:11759 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 1031 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7583 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 780, Top: 0 ft., Bottom: 7583 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7483 ft., Depth: 11759 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/23/2013
Spud Date:10/21/2013Spud Date Is:ACTUAL
Measured TD:11763 ft.Measured PB depth:11661 ft.
True Vertical TD:7184 ft.True Vertical PB depth:7184 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 694 FSL  2353 FEL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 513 FNL  2388 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 387, Top: 0 ft., Bottom: 1031 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7645 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 75 ft., Bottom: 7645 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6570 ft., Depth: 11763 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 6583 ft., Bottom: 11763 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7142 ft.
NIOBRARA7318 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 3/11/2024                 Interval Top: 7665 ft.    Interval Bottom: 11576 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/23/2014Treatment End Date:1/27/2014
Treatment Summary:PERF AND FRAC FROM 7665-11576. 715 BBL CROSSLINK GEL,114664 BBL SLICKWATER,115379 BBL TOTAL FLUID. 3339778# 40/70 OTTAWA/ST. PETERS SAND,3339778# TOTAL SAND.
Total fluid used in treatment (bbls):115379Max pressure during treatment (psi):6708
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4198
Fresh water used in treatment (bbls):115379Disposition method For flowback:RECYCLE
Total proppant used (lbs):3339778Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 122
BBLS_OIL 365
BTU_GAS 1300
CALC_BBLS_H2O 122
CALC_BBLS_OIL 365
CALC_GOR 1747
CALC_MCF_GAS 638
CASING_PRESS 1000
GRAVITY_OIL 46
MCF_GAS 638
Perforation Data:
Interval Top:7665 ft.# Of Holes:408
Interval Bottom:11576 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/11/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No