|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/8/2014 Measured TD: 14700 ft. Vertical TD: 7552 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/8/2014 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/25/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 585 FNL 2124 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2078 FNL 1892 FWL | | Proposed Depth/Form: | 14664 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 140, Top: 0 ft., Bottom: 1114 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8014 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 455, Top: 814 ft., Bottom: 8014 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14664 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 264, Top: 7714 ft., Bottom: 14664 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/16/2013 | | Spud Date: | 11/1/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 14700 ft. | Measured PB depth: | 14677 ft. | | True Vertical TD: | 7552 ft. | True Vertical PB depth: | 7262 ft. | | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 585 FNL 2124 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2078 FNL 1892 FWL | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 97 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.6 in., Top: 0 ft., Depth: 1241 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 1241 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7929 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 1232 ft., Bottom: 7939 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 6929 ft., Depth: 14681 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 514, Top: 6929 ft., Bottom: 14681 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4786 ft. | | N | N | | SHANNON | 5361 ft. | | N | N | | TEEPEE BUTTES | 6777 ft. | | N | N | | SHARON SPRINGS | 7333 ft. | | N | N | | NIOBRARA | 7410 ft. | | N | N | | FORT HAYS | 7732 ft. | | N | N | | CODELL | 7822 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 7/8/2014 Interval Top: 7940 ft. Interval Bottom: 14634 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/3/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/23/2014 | Treatment End Date: | 5/31/2014 | | Treatment Summary: | Stages 1-44 treated with a total of: 71,665 bbls of slickwater and 4,091,531 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 71665 | Max pressure during treatment (psi): | 7902 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 44 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 2650 | Total flowback volume recovered (bbls): | 805 | | Fresh water used in treatment (bbls): | 69015 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4091531 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7681 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 325 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 325 | | CALC_GOR | 480 | | CALC_MCF_GAS | 156 | | CASING_PRESS | 2324 | | GRAVITY_OIL | 50 | | MCF_GAS | 156 | | TUBING_PRESS | 2034 |
| | Perforation Data: | | Interval Top: | 7940 ft. | # Of Holes: | 1164 | | Interval Bottom: | 14634 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2977 |
| Total Gas Produced (MCF) | 69929 |
| GOR | 23489 |
| GOR Determination | MCFE |
| Average BOE per Day | 41.197 |
| Average MCFE per Day | 238.942 |
| Federal Financial Assurance | i | |
|
|