Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37681
Well Classification: OW Status: SI - 8/1/2025
Well Name/No:HOWARD #30C-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:433541LocationID:433536
County:WELD #123Location:SWSW 28 1N67W 6
Field:WATTENBERG - #90750Elevation:5008 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:290FSL  1264 FWLLat/Long: 40.015625 / -104.900356Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.015628 / -104.900360Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/21/2014
End Date: 2/22/2014
Reported: 4/4/2014
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2025             Measured TD: 12858 ft.    Vertical TD: 7720 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/11/2015
Proposed Top PZ Location:Sec:28 Twp: 1N 67W Footage: 621 FSL  50 FWL
Bottom Hole Location:Sec:28 Twp: 1N 67W Footage: 65 FNL  50 FWL
Proposed Depth/Form:12884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8235 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8235 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7230 ft., Depth: 12884 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/4/2013
Spud Date:8/1/2013Spud Date Is:ACTUAL
Measured TD:12858 ft.Measured PB depth:12834 ft.
True Vertical TD:7720 ft.True Vertical PB depth:7720 ft.
Top PZ Location:Sec:28 Twp: 1N 67WFootage: 621 FSL  50 FWL
Bottom Hole Location:Sec:28 Twp: 1N 67WFootage: 65 FNL  50 FWL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 382, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8269 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 818, Top: 410 ft., Bottom: 8269 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7360 ft., Depth: 12843 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7480 ft.
NIOBRARA7503 ft.
FORT HAYS8073 ft.
CODELL8140 ft.

Formation CODL                     Formation Classification:  OW                     Status:  SI - 8/1/2025                  Interval Top: 8321 ft.    Interval Bottom: 12858 ft.

 Completed Information for Formation CODELL
1st Production Date:3/27/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/21/2014Treatment End Date:2/22/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8321-12858. 11179 BBL CROSSLINK GEL,2135 BBL LINEAR GEL,76257 BBL SLICKWATER,89570 BBL TOTAL FLUID. 335460# 30/50 OTTAWA/ST. PETERS,2144120# 40/70 OTTAWA/ST. PETERS,2479580# TOTAL SAND.
Total fluid used in treatment (bbls):89570Max pressure during treatment (psi):6801
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.08
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1706
Fresh water used in treatment (bbls):89570Disposition method For flowback:RECYCLE
Total proppant used (lbs):2479580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 450
BTU_GAS 1118
CALC_BBLS_OIL 450
CALC_GOR 866
CALC_MCF_GAS 390
CASING_PRESS 1800
GRAVITY_OIL 48
MCF_GAS 390
Perforation Data:
Interval Top:8321 ft.# Of Holes:0
Interval Bottom:12858 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)157
Total Gas Produced (MCF)478
GOR3044
GOR DeterminationBOE
Average BOE per Day0.653
Average MCFE per Day3.797

 Federal Financial Assurance  i 

 Tribal Well  i No