Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37676
Well Classification: OW Status: PR - 12/10/2014
Well Name/No:HOWARD #4N-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/10/2014
FacilityID:433535LocationID:433536
County:WELD #123Location:SWSW 28 1N67W 6
Field:WATTENBERG - #90750Elevation:5008 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:290FSL  1294 FWLLat/Long: 40.015625 / -104.900249Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.015627 / -104.900254Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/18/2014
End Date: 2/20/2014
Reported: 4/14/2014
Originally Reported: 4/4/2014
Days to report: 53
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/10/2014             Measured TD: 12586 ft.    Vertical TD: 7508 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/10/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/11/2015
Proposed Top PZ Location:Sec:28 Twp: 1N 67W Footage: 723 FSL  503 FWL
Bottom Hole Location:Sec:28 Twp: 1N 67W Footage: 25 FNL  510 FWL
Proposed Depth/Form:12582 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.625 in., Size: 7 in., Top: 0 ft., Depth: 7932 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 840, Top: 0 ft., Bottom: 7932 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6928 ft., Depth: 12582 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/8/2013
Spud Date:8/3/2013Spud Date Is:ACTUAL
Measured TD:12586 ft.Measured PB depth:12562 ft.
True Vertical TD:7508 ft.True Vertical PB depth:7507 ft.
Top PZ Location:Sec:28 Twp: 1N 67WFootage: 723 FSL  503 FWL
Bottom Hole Location:Sec:28 Twp: 1N 67WFootage: 25 FNL  510 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1038 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 389, Top: 0 ft., Bottom: 1038 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8058 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 590 ft., Bottom: 8058 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7221 ft., Depth: 12570 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7453 ft.
NIOBRARA7481 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/10/2014                Interval Top: 8094 ft.    Interval Bottom: 12586 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/27/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/18/2014Treatment End Date:2/20/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8094-12586. 48 BBL ACID,17667 BBL CROSSLINK GEL,2002 BBL LINEAR GEL,110916 BBL SLICKWATER,130632 BBL TOTAL FLUID. 528560# 30/50 OTTAWA/ST. PETERS,3253800# 40/70 OTTAWA/ST. PETERS,3782360# TOTAL SAND.
Total fluid used in treatment (bbls):130632Max pressure during treatment (psi):8289
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):2714Total flowback volume recovered (bbls):6139
Fresh water used in treatment (bbls):127871Disposition method For flowback:RECYCLE
Total proppant used (lbs):3782360Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 129
BTU_GAS 1118
CALC_BBLS_OIL 129
CALC_GOR 1899
CALC_MCF_GAS 240
CASING_PRESS 1000
GRAVITY_OIL 48
MCF_GAS 245
Perforation Data:
Interval Top:8094 ft.# Of Holes:0
Interval Bottom:12586 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)818
Total Gas Produced (MCF)21846
GOR26706
GOR DeterminationMCFE
Average BOE per Day12.532
Average MCFE per Day72.667

 Federal Financial Assurance  i 

 Tribal Well  i No