Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37672
Well Classification: OW Status: PR - 2/9/2014
Well Name/No:HENRICKSON FEDERAL #35N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/9/2014
FacilityID:433518LocationID:330278
County:WELD #123Location:NESW 7 3N66W 6
Field:WATTENBERG - #90750Elevation:4794 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1825FSL  2078 FWLLat/Long: 40.236828 / -104.822441Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.236829 / -104.822447Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/15/2013
End Date: 12/17/2013
Reported: 2/6/2014
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/9/2014             Measured TD: 14050 ft.    Vertical TD: 7081 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/9/2014
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/4/2015
Proposed Top PZ Location:Sec:7 Twp: 3N 66W Footage: 1312 FSL  1545 FWL
Bottom Hole Location:Sec:18 Twp: 3N 66W Footage: 460 FSL  1545 FWL
Proposed Depth/Form:13598 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7464 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 790, Top: 0 ft., Bottom: 7464 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6463 ft., Depth: 13598 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/5/2013
Spud Date:8/22/2013Spud Date Is:ACTUAL
Measured TD:14050 ft.Measured PB depth:14031 ft.
True Vertical TD:7081 ft.True Vertical PB depth:7082 ft.
Top PZ Location:Sec:7 Twp: 3N 66WFootage: 1647 FSL  1192 FWL
Bottom Hole Location:Sec:18 Twp: 3N 66WFootage: 486 FSL  1209 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 381, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7621 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 752, Top: 25 ft., Bottom: 7621 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6555 ft., Depth: 14040 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7183 ft.
NIOBRARA7281 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/9/2014                  Interval Top: 7680 ft.    Interval Bottom: 14050 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/2/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/15/2013Treatment End Date:12/17/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7680-14050. 60958 BBL CROSSLINK GEL,4343 BBL LINEAR GEL,55776 BBL SLICKWATER,121077 BBL TOTAL FLUID 3516224# 30/50 OTTAWA/ST. PETERS SAND,1446315# 40/70 OTTAWA/ST. PETERS SAND,4962539# TOTAL SAND.
Total fluid used in treatment (bbls):121077Max pressure during treatment (psi):7243
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11270
Fresh water used in treatment (bbls):121077Disposition method For flowback:RECYCLE
Total proppant used (lbs):4962539Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 282
BTU_GAS 1247
CALC_BBLS_OIL 282
CALC_GOR 2301
CALC_MCF_GAS 649
CASING_PRESS 1900
GRAVITY_OIL 54
MCF_GAS 649
Perforation Data:
Interval Top:7680 ft.# Of Holes:0
Interval Bottom:14050 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4313
Total Gas Produced (MCF)42032
GOR9745
GOR DeterminationBOE
Average BOE per Day31.675
Average MCFE per Day183.702

 Federal Financial Assurance  i 

 Tribal Well  i No