Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37663
Well Classification: OW Status: PR - 7/1/2025
Well Name/No:Frederiksen #1A-28H-A368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2025
FacilityID:433499LocationID:433501
Municipality/County:MEAD / WELD #123Location:NENE 28 3N68W 6
Field:WATTENBERG - #90750Elevation:4996 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:753FNL  267 FELLat/Long: 40.202050 / -104.999330Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202063 / -104.999350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2014
End Date: 6/28/2014
Reported: 8/26/2014
Days to report: 59
Disclosure: Sidetrack #00
Start Date: 6/24/2014
End Date: 7/5/2014
Reported: 9/3/2014
Days to report: 60
Disclosure: Sidetrack #00
Start Date: 6/27/2014
End Date: 6/30/2014
Reported: 8/26/2014
Days to report: 57
Disclosure: Sidetrack #00
Start Date: 6/27/2014
End Date: 7/5/2014
Reported: 9/3/2014
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2025             Measured TD: 11580 ft.    Vertical TD: 6952 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:28 Twp: 3N 68W Footage: 75 FNL  608 FEL
Bottom Hole Location:Sec:28 Twp: 3N 68W Footage: 25 FNL  460 FWL
Proposed Depth/Form:11639 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: , Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: , Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7418 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 419, Top: 500 ft., Bottom: 7418 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11638 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 7118 ft., Bottom: 11638 ft.

Wellbore Completed
Completion Date:4/30/2014
Spud Date:3/1/2014Spud Date Is:ACTUAL
Measured TD:11580 ft.Measured PB depth:11485 ft.
True Vertical TD:6952 ft.True Vertical PB depth:6952 ft.
Top PZ Location:Sec:28 Twp: 3N 68WFootage: 79 FNL  913 FEL
Bottom Hole Location:Sec:28 Twp: 3N 68WFootage: 14 FNL  488 FWL
Log Types:CBL, MWD, (Induction 05.123.37661)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 19 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 841 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 15 ft., Bottom: 841 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7585 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 800 ft., Bottom: 7585 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 7585 ft., Depth: 11564 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 6585 ft., Bottom: 11564 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4021 ft.
SHANNON4550 ft.
TEEPEE BUTTES5571 ft.
SHARON SPRINGS7107 ft.
NIOBRARA7251 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2025                  Interval Top: 7691 ft.    Interval Bottom: 11513 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/12/2014Choke Size:12.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/6/2014Treatment End Date:7/11/2014
Treatment Summary:Stage S1 - Stage S28 treated with a total of: 110,115 bbls of Slickwater, 619 bbls 15% Hydrochloric Acid, 1,330,560 lbs of 30/70 sand proppant
Total fluid used in treatment (bbls):110734Max pressure during treatment (psi):7683
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):619Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2150
Fresh water used in treatment (bbls):110115Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1330560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7254 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/19/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 381
BBLS_OIL 178
BTU_GAS 1298
CALC_BBLS_H2O 381
CALC_BBLS_OIL 178
CALC_GOR 1067
CALC_MCF_GAS 190
CASING_PRESS 2184
GRAVITY_OIL 50
MCF_GAS 190
TUBING_PRESS 1306
Perforation Data:
Interval Top:7691 ft.# Of Holes:756
Interval Bottom:11513 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)715
Total Gas Produced (MCF)7835
GOR10958
GOR DeterminationBOE
Average BOE per Day5.613
Average MCFE per Day32.554

 Federal Financial Assurance  i 

 Tribal Well  i No