Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37650
Well Classification: OW Status: PR - 7/1/2015
Well Name/No:Grant Elmquist #2B-14H C268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2015
FacilityID:433466LocationID:433455
Municipality/County:FIRESTONE / WELD #123Location:NENW 14 2N68W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:796FNL  1653 FWLLat/Long: 40.143860 / -104.973860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.143858 / -104.973859Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/13/2015
End Date: 2/18/2015
Reported: 4/7/2015
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2015             Measured TD: 13645 ft.    Vertical TD: 7493 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/1/2015
Proposed Top PZ Location:Sec:14 Twp: 2N 68W Footage: 1174 FNL  559 FWL
Bottom Hole Location:Sec:23 Twp: 2N 68W Footage: 2193 FNL  575 FWL
Proposed Depth/Form:14158 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7824 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 443, Top: 500 ft., Bottom: 7824 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14158 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 253, Top: 7524 ft., Bottom: 14158 ft.

Wellbore Completed
Completion Date:12/27/2014
Spud Date:10/18/2014Spud Date Is:ACTUAL
Measured TD:13645 ft.Measured PB depth:13574 ft.
True Vertical TD:7493 ft.True Vertical PB depth:7493 ft.
Top PZ Location:Sec:14 Twp: 2N 68WFootage: 1404 FNL  568 FWL
Bottom Hole Location:Sec:23 Twp: 2N 68WFootage: 1806 FNL  483 FWL
Log Types:CBL, MWD. Resistivity log in 123-37643.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 115, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 854 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 864 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7921 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 691, Top: 600 ft., Bottom: 7940 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13626 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 517, Top: 5921 ft., Bottom: 13645 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7180 ft.
NIOBRARA7300 ft.
FORT HAYS7753 ft.
CODELL7849 ft.
CARLILE8234 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/2/2017                  Interval Top: 10876 ft.    Interval Bottom: 11223 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:7/17/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/19/2015
Treatment Summary:10876 – 11223’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10876 ft.# Of Holes:675
Interval Bottom:11223 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/2/2017                  Interval Top: 8233 ft.    Interval Bottom: 8675 ft.

 Completed Information for Formation CARLILE
1st Production Date:7/17/2015Choke Size: 
Formation Name:CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/19/2015
Treatment Summary:8233-8675’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8233 ft.# Of Holes:675
Interval Bottom:8675 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/25/2015                 Interval Top: 7939 ft.    Interval Bottom: 13572 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/17/2015Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/19/2015
Treatment Summary:Stages 1 - 25 treated with a total of 49,050 bbls of fresh water, 314 bbls of slickwater, 4,000 bbls of recycled water and 3,592,376 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):53364Max pressure during treatment (psi):8269
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):4000Total flowback volume recovered (bbls):4000
Fresh water used in treatment (bbls):49364Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3592376Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7280 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2015Test Method:FLOWS FROM WELL
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 645
BTU_GAS 1298
CALC_BBLS_OIL 645
CALC_GOR 730
CALC_MCF_GAS 471
CASING_PRESS 2482
GRAVITY_OIL 50
MCF_GAS 471
TUBING_PRESS 1794
Perforation Data:
Interval Top:7939 ft.# Of Holes:675
Interval Bottom:13572 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/2/2017                  Interval Top: 7921 ft.    Interval Bottom: 13645 ft.

 Completed Information for Formation CODELL
1st Production Date:7/17/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/19/2015
Treatment Summary:7921-8233’, 8675-10876’,11223-13645’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7921 ft.# Of Holes:675
Interval Bottom:13645 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1869
Total Gas Produced (MCF)53703
GOR28733
GOR DeterminationMCFE
Average BOE per Day30.463
Average MCFE per Day176.671

 Federal Financial Assurance  i 

 Tribal Well  i No