|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2015 Measured TD: 13645 ft. Vertical TD: 7493 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2015 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/1/2015 | | Proposed Top PZ Location: | Sec:14 Twp: 2N 68W | Footage: 1174 FNL 559 FWL | | Bottom Hole Location: | Sec:23 Twp: 2N 68W | Footage: 2193 FNL 575 FWL | | Proposed Depth/Form: | 14158 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7824 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 443, Top: 500 ft., Bottom: 7824 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14158 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 253, Top: 7524 ft., Bottom: 14158 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/27/2014 | | Spud Date: | 10/18/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 13645 ft. | Measured PB depth: | 13574 ft. | | True Vertical TD: | 7493 ft. | True Vertical PB depth: | 7493 ft. | | Top PZ Location: | Sec:14 Twp: 2N 68W | Footage: 1404 FNL 568 FWL | | Bottom Hole Location: | Sec:23 Twp: 2N 68W | Footage: 1806 FNL 483 FWL | | Log Types: | CBL, MWD. Resistivity log in 123-37643. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 115, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 854 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 864 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7921 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 691, Top: 600 ft., Bottom: 7940 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13626 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 517, Top: 5921 ft., Bottom: 13645 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7180 ft. | | | | | NIOBRARA | 7300 ft. | | | | | FORT HAYS | 7753 ft. | | | | | CODELL | 7849 ft. | | | | | CARLILE | 8234 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 5/2/2017 Interval Top: 10876 ft. Interval Bottom: 11223 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 7/17/2015 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/13/2015 | Treatment End Date: | 2/19/2015 | | Treatment Summary: | 10876 – 11223’ MD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10876 ft. | # Of Holes: | 675 | | Interval Bottom: | 11223 ft. | Hole Size: | |
|
Formation CARL Formation Classification: OW Status: CM - 5/2/2017 Interval Top: 8233 ft. Interval Bottom: 8675 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 7/17/2015 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/13/2015 | Treatment End Date: | 2/19/2015 | | Treatment Summary: | 8233-8675’ MD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8233 ft. | # Of Holes: | 675 | | Interval Bottom: | 8675 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: PR - 7/25/2015 Interval Top: 7939 ft. Interval Bottom: 13572 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/17/2015 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/13/2015 | Treatment End Date: | 2/19/2015 | | Treatment Summary: | Stages 1 - 25 treated with a total of 49,050 bbls of fresh water, 314 bbls of slickwater, 4,000 bbls of recycled water and 3,592,376 lbs of 40/70 Sand Proppant | | Total fluid used in treatment (bbls): | 53364 | Max pressure during treatment (psi): | 8269 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 25 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 4000 | Total flowback volume recovered (bbls): | 4000 | | Fresh water used in treatment (bbls): | 49364 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3592376 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7280 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/25/2015 | Test Method: | FLOWS FROM WELL | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 645 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 645 | | CALC_GOR | 730 | | CALC_MCF_GAS | 471 | | CASING_PRESS | 2482 | | GRAVITY_OIL | 50 | | MCF_GAS | 471 | | TUBING_PRESS | 1794 |
| | Perforation Data: | | Interval Top: | 7939 ft. | # Of Holes: | 675 | | Interval Bottom: | 13572 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/2/2017 Interval Top: 7921 ft. Interval Bottom: 13645 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/17/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/13/2015 | Treatment End Date: | 2/19/2015 | | Treatment Summary: | 7921-8233’, 8675-10876’,11223-13645’ MD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7921 ft. | # Of Holes: | 675 | | Interval Bottom: | 13645 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1869 |
| Total Gas Produced (MCF) | 53703 |
| GOR | 28733 |
| GOR Determination | MCFE |
| Average BOE per Day | 30.463 |
| Average MCFE per Day | 176.671 |
| Federal Financial Assurance | i | |
|
|