|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/2/2021 Measured TD: 7537 ft. Vertical TD: 7459 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/2/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/1/2015 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 1315 FNL 2222 FEL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 1308 FNL 2220 FEL | | Proposed Depth/Form: | 7554 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 419, Top: 0 ft., Bottom: 907 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7554 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 745, Top: 3567 ft., Bottom: 7554 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/5/2013 | | Spud Date: | 3/31/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7537 ft. | Measured PB depth: | 7505 ft. | | True Vertical TD: | 7459 ft. | True Vertical PB depth: | 7427 ft. | | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 1315 FNL 2222 FEL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 1308 FNL 2220 FEL | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 943 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 943 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7519 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 2634 ft., Bottom: 7537 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4025 ft. | 4215 ft. | N | N | | SUSSEX | 4414 ft. | 4610 ft. | N | N | | SHANNON | 5204 ft. | 5332 ft. | N | N | | SHARON SPRINGS | 7023 ft. | 7077 ft. | N | N | | NIOBRARA | 7077 ft. | 7331 ft. | N | N | | FORT HAYS | 7331 ft. | 7351 ft. | N | N | | CODELL | 7351 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 5/1/2015 Interval Top: 7354 ft. Interval Bottom: 7369 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/11/2013 | Treatment End Date: | 6/11/2013 | | Treatment Summary: | Codell frac Treatment Totals: Total 200,070 lbs 20/40 Ottawa, & 4,000 lbs 20/40 SLC Pumped 1.0 ppa to 4.0 ppa in 1851 bbls of fluid. Total fluid pumped 3058 bbls.
| | Total fluid used in treatment (bbls): | 3058 | Max pressure during treatment (psi): | 4413 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1701 | | Fresh water used in treatment (bbls): | 3058 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 200070 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7354 ft. | # Of Holes: | 26 | | Interval Bottom: | 7369 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/2/2021 Interval Top: 7124 ft. Interval Bottom: 7369 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2013 | Test Method: | Test Seperator | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BTU_GAS | 1263 | | CALC_BBLS_H2O | 25 | | CALC_MCF_GAS | 16 | | CASING_PRESS | 1797 | | GRAVITY_OIL | 49 | | MCF_GAS | 16 |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 78 | | Interval Bottom: | 7369 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 5/1/2015 Interval Top: 7088 ft. Interval Bottom: 7228 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2013 | Treatment End Date: | 6/11/2013 | | Treatment Summary: | Niobrara frac Treatment Totals: Total 204,460 lbs 40/70 Ottawa, 4,000 lbs 20/40 SLC Pumped 0.5 ppa to 2.2 ppa in 4407 bbls of fluid. Total fluid pumped 6094 bbls, 740 bbls of that water was filtered.
| | Total fluid used in treatment (bbls): | 6094 | Max pressure during treatment (psi): | 4670 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1701 | | Fresh water used in treatment (bbls): | 6094 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204460 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7088 ft. | # Of Holes: | 52 | | Interval Bottom: | 7228 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/02/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|