Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37643
Well Classification: OW Status: PR - 5/1/2022
Well Name/No:Grant Elmquist #2D-14H C268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2022
FacilityID:433452LocationID:433455
Municipality/County:FIRESTONE / WELD #123Location:NENW 14 2N68W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:796FNL  1673 FWLLat/Long: 40.143860 / -104.973790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.143857 / -104.973787Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2015
End Date: 2/13/2015
Reported: 4/7/2015
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2022             Measured TD: 13900 ft.    Vertical TD: 7485 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2015
Proposed Depth/Form:14091 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7750 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 439, Top: 500 ft., Bottom: 7750 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14090 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 253, Top: 7450 ft., Bottom: 14090 ft.

Wellbore Completed
Completion Date:12/6/2014
Spud Date:10/19/2014Spud Date Is:ACTUAL
Measured TD:13900 ft.Measured PB depth:13838 ft.
True Vertical TD:7485 ft.True Vertical PB depth:7485 ft.
Log Types:MWD,CBL, Resistivity log.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 858 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 359, Top: 0 ft., Bottom: 868 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7838 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 688, Top: 580 ft., Bottom: 7860 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13890 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 534, Top: 5838 ft., Bottom: 13900 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7122 ft.
NIOBRARA7226 ft.
FORT HAYS7672 ft.
CODELL7757 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/2/2017                  Interval Top: 12412 ft.    Interval Bottom: 13838 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:7/17/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2015Treatment End Date:2/13/2015
Treatment Summary:12412-13838’ MD.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12412 ft.# Of Holes:732
Interval Bottom:13838 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 5/1/2022                  Interval Top: 7860 ft.    Interval Bottom: 13838 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/17/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2015Treatment End Date:2/13/2015
Treatment Summary:Stages 1 - 27 treated with a total of 73,999 bbls of fresh water, 4,000 bbls of recycled water, 357 bbls of slickwater, 179 bbls of acid 15% HCL, and 3,851,508 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):78535Max pressure during treatment (psi):8561
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):179Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):4000Total flowback volume recovered (bbls):4000
Fresh water used in treatment (bbls):74356Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3851508Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7508 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2015Test Method:FLOWS FROM WELL
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 668
BTU_GAS 1298
CALC_BBLS_OIL 668
CALC_GOR 361
CALC_MCF_GAS 241
CASING_PRESS 2535
GRAVITY_OIL 50
MCF_GAS 241
TUBING_PRESS 1747
Perforation Data:
Interval Top:7860 ft.# Of Holes:732
Interval Bottom:13838 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/2/2017                  Interval Top: 7838 ft.    Interval Bottom: 12412 ft.

 Completed Information for Formation CODELL
1st Production Date:7/17/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2015Treatment End Date:2/13/2015
Treatment Summary:7838-12412’ MD
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7838 ft.# Of Holes:732
Interval Bottom:12412 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1033
Total Gas Produced (MCF)37882
GOR36671
GOR DeterminationMCFE
Average BOE per Day20.704
Average MCFE per Day120.071

 Federal Financial Assurance  i 

 Tribal Well  i No