Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37624
Well Classification: OW Status: PR - 1/20/2015
Well Name/No:ROHN STATE #LD10-62HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/20/2015
FacilityID:433414LocationID:422853
County:WELD #123Location:SESE 9 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4719 ft.
Planned Location:810FSL  330 FELLat/Long: 40.760800 / -103.861070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.760808 / -103.861083Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/15/2014
End Date: 12/17/2014
Reported: 1/27/2015
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/20/2015             Measured TD: 10130 ft.    Vertical TD: 5606 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/20/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2015
Prop Depth/Form:10089 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Sec. 3, 4, 9, 10, 16
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5946 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 5946 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5796 ft., Depth: 10089 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/26/2014
Spud Date:10/22/2014Spud Date Is:ACTUAL
Measured TD:10130 ft.Measured PB depth:10130 ft.
True Vertical TD:5606 ft.True Vertical PB depth:5606 ft.
Top PZ Location:Sec:10 Twp: 9N 58WFootage: 770 FSL  599 FWLDepth
Bottom Hole Location:Sec:10 Twp: 9N 58WFootage: 679 FSL  663 FELDepth
Log Types:CBL/Mud/Gamma
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1203 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 487, Top: 0 ft., Bottom: 1203 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5985 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 434, Top: 1822 ft., Bottom: 5985 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5842 ft., Depth: 10120 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2194 ft.
PARKMAN3216 ft.
SUSSEX3848 ft.
SHANNON4297 ft.
NIOBRARA5839 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/20/2015                 Interval Top: 6114 ft.    Interval Bottom: 10038 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/12/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/15/2014Treatment End Date:12/17/2014
Treatment Summary:Frac'd the Niobrara w/ 3301005 gals of Silverstim and Slick Water with 4192995#'s of Ottawa sand.
Total fluid used in treatment (bbls):78595Max pressure during treatment (psi):5580
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):3960Total flowback volume recovered (bbls):264
Fresh water used in treatment (bbls):74634Disposition method For flowback:RECYCLE
Total proppant used (lbs):4192995Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5850 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 452
BBLS_OIL 231
BTU_GAS 1352
CALC_BBLS_H2O 452
CALC_BBLS_OIL 231
CALC_GOR 766
CALC_MCF_GAS 177
CASING_PRESS 914
GRAVITY_OIL 40
MCF_GAS 177
TUBING_PRESS 326
Perforation Data:
Interval Top:6114 ft.# Of Holes:
Interval Bottom:10038 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)3594
Total Gas Produced (MCF)16554
GOR4606
GOR DeterminationBOE
Average BOE per Day17.649
Average MCFE per Day102.355

 Federal Financial Assurance  i 

 Tribal Well  i No