Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37594
Well Classification: OW Status: PR - 12/27/2013
Well Name/No:DCP #16N-17HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/27/2013
FacilityID:433370LocationID:305114
County:WELD #123Location:NESE 8 3N66W 6
Field:WATTENBERG - #90750Elevation:4855 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2168FSL  559 FELLat/Long: 40.238004 / -104.793920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.238004 / -104.793920Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/1/2013
End Date: 12/3/2013
Reported: 1/23/2014
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/27/2013             Measured TD: 13583 ft.    Vertical TD: 7158 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/27/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/24/2015
Proposed Top PZ Location:Sec:8 Twp: 3N 66W Footage: 1806 FSL  700 FEL
Bottom Hole Location:Sec:17 Twp: 3N 66W Footage: 460 FSL  740 FEL
Proposed Depth/Form:14106 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7495 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 760, Top: 0 ft., Bottom: 7495 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6498 ft., Depth: 14106 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/13/2013
Spud Date:7/26/2013Spud Date Is:ACTUAL
Measured TD:13583 ft.Measured PB depth:13559 ft.
True Vertical TD:7158 ft.True Vertical PB depth:7160 ft.
Top PZ Location:Sec:8 Twp: 3N 66WFootage: 1766 FSL  536 FEL
Bottom Hole Location:Sec:17 Twp: 3N 66WFootage: 1004 FSL  509 FEL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 932 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 932 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 7547 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 752, Top: 44 ft., Bottom: 7547 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6534 ft., Depth: 13568 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7068 ft.
NIOBRARA7146 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/27/2013                Interval Top: 7580 ft.    Interval Bottom: 13583 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/16/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/1/2013Treatment End Date:12/3/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7580-13583. 19401 BBL CROSSLINK GEL,3739 BBL LINEAR GEL,90063 BBL SLICKWATER,113203 BBL TOTAL FLUID 581998# 30/50 OTTAWA/ST. PETERS SAND,2601990# 40/70 OTTAWA/ST. PETERS SAND,3183988# TOTAL SAND.
Total fluid used in treatment (bbls):113203Max pressure during treatment (psi):7457
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):3125Total flowback volume recovered (bbls):9416
Fresh water used in treatment (bbls):110078Disposition method For flowback:RECYCLE
Total proppant used (lbs):3183988Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 116
BTU_GAS 1198
CALC_BBLS_OIL 116
CALC_GOR 4793
CALC_MCF_GAS 556
CASING_PRESS 2501
GRAVITY_OIL 56
MCF_GAS 556
Perforation Data:
Interval Top:7580 ft.# Of Holes:0
Interval Bottom:13583 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2020
Total Gas Produced (MCF)52677
GOR26077
GOR DeterminationMCFE
Average BOE per Day30.375
Average MCFE per Day176.149

 Federal Financial Assurance  i 

 Tribal Well  i No