|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 4/1/2022 Measured TD: 7655 ft. Vertical TD: 7335 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 4/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/20/2015 | Prop Depth/Form: | 7679 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: N2 SW4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 80, Drill Unit: N2 SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 770 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 539, Top: 0 ft., Bottom: 770 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7679 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 896, Top: 3100 ft., Bottom: 7679 ft. |
| | |
Wellbore Completed | Completion Date: | 11/5/2013 | Spud Date: | 10/31/2013 | Spud Date Is: | ACTUAL | Measured TD: | 7655 ft. | Measured PB depth: | 7627 ft. | True Vertical TD: | 7335 ft. | True Vertical PB depth: | 7306 ft. | Top PZ Location: | Sec:15 Twp: 7N 67W | Footage: 1964 FSL 642 FWL | Depth | Bottom Hole Location: | Sec:15 Twp: 7N 67W | Footage: 1976 FSL 611 FWL | Depth | Log Types: | Induction, Density, Neutron, Gamma Ray, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 791 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 0 ft., Bottom: 791 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7644 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 925, Top: 710 ft., Bottom: 7644 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3696 ft. | | N | N | SUSSEX | 4520 ft. | | N | N | SHANNON | 4880 ft. | | N | N | NIOBRARA | 7204 ft. | | N | N | FORT HAYS | 7440 ft. | | N | N | CODELL | 7490 ft. | | N | N |
Formation CODL Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 7490 ft. Interval Bottom: 7510 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/28/2014 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/23/2013 | Treatment End Date: | 11/23/2013 | Treatment Summary: | Frac CODL w/ 280,770 gal fluid and 175,803# 30/50 sand (280,770 gal slick wtr). ISIP=3341 psi (0.878 F.G.). ATP=4570 psi, ATR=51.4 BPM, MTP=5317 psi, MTR=63.1 BPM. | Total fluid used in treatment (bbls): | 6685 | Max pressure during treatment (psi): | 5317 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 902 | Fresh water used in treatment (bbls): | 6685 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 175803 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/28/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 33 | BBLS_OIL | 48 | BTU_GAS | 1308 | CALC_BBLS_H2O | 33 | CALC_BBLS_OIL | 48 | CASING_PRESS | 280 | GRAVITY_OIL | 40 |
| Perforation Data: | Interval Top: | 7490 ft. | # Of Holes: | 80 | Interval Bottom: | 7510 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 03/31/2022 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|