Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37585
Well Classification: OW Status: SI - 12/1/2025
Well Name/No:Drieth #1B-6H-A368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:433336LocationID:432235
County:WELD #123Location:NENE 6 3N68W 6
Field:WATTENBERG - #90750Elevation:5087 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:686FNL  434 FELLat/Long: 40.260160 / -105.038150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.260155 / -105.038149Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/20/2014
End Date: 12/30/2014
Reported: 2/24/2015
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2025             Measured TD: 11617 ft.    Vertical TD: 7202 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/20/2015
Proposed Top PZ Location:Sec:6 Twp: 3N 68W Footage: 475 FNL  753 FEL
Bottom Hole Location:Sec:6 Twp: 3N 68W Footage: 420 FNL  493 FWL
Proposed Depth/Form:11655 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7704 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 436, Top: 500 ft., Bottom: 7704 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11655 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 163, Top: 7404 ft., Bottom: 11655 ft.

Wellbore Completed
Completion Date:10/3/2014
Spud Date:8/17/2014Spud Date Is:ACTUAL
Measured TD:11617 ft.Measured PB depth:11599 ft.
True Vertical TD:7202 ft.True Vertical PB depth:7203 ft.
Top PZ Location:Sec:6 Twp: 3N 68WFootage: 475 FNL  773 FEL
Bottom Hole Location:Sec:6 Twp: 3N 68WFootage: 420 FNL  493 FWL
Log Types:CBL, MWD, (DIL in 123-36823)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 128, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 838 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7717 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 715 ft., Bottom: 7717 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11601 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 6717 ft., Bottom: 11601 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE370 ft.
SUSSEX3910 ft.
TEEPEE BUTTES4387 ft.
SHARON SPRINGS7003 ft.
NIOBRARA7066 ft.
FORT HAYS7570 ft.
CODELL7664 ft.

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 12/1/2025                 Interval Top: 7741 ft.    Interval Bottom: 11559 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/25/2015Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/20/2014Treatment End Date:12/30/2014
Treatment Summary:Stages 1-38 treated with 48,319 bbls of fresh water, 284 bbls Hybrid (Gel & Slickwater), 12 bbls 15% HCL acid, and 2,485,852 lbs of 40/70 sand proppant
Total fluid used in treatment (bbls):48615Max pressure during treatment (psi):7996
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6130
Fresh water used in treatment (bbls):48603Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2485852Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7312 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2015Test Method:FLOW
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 156
BBLS_OIL 123
BTU_GAS 1298
CALC_BBLS_H2O 156
CALC_BBLS_OIL 123
CALC_GOR 918
CALC_MCF_GAS 113
CASING_PRESS 1760
GRAVITY_OIL 50
MCF_GAS 113
TUBING_PRESS 695
Perforation Data:
Interval Top:7741 ft.# Of Holes:870
Interval Bottom:11559 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/28/2016                Interval Top: 7664 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 11-17: Top = 9846' Bottom = 10504' Stages 24-38: Top = 7741' Bottom = 9199
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:464
Interval Bottom:Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/28/2016                Interval Top: 7570 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 18-23 stimulated the Fort Hays formation.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/28/2016

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 1-13 stimulated the Fairport/Carlile formation.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:# Of Holes:294
Interval Bottom:Hole Size:0.44 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)8
Total Gas Produced (MCF)83
GOR10375
GOR DeterminationBOE
Average BOE per Day0.061
Average MCFE per Day0.358

 Federal Financial Assurance  i 

 Tribal Well  i No