Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37574
Well Classification: OW Status: PR - 12/27/2013
Well Name/No:EISENACH FEDERAL #5N-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/27/2013
FacilityID:433293LocationID:327738
County:WELD #123Location:SENE 8 3N66W 6
Field:WATTENBERG - #90750Elevation:4826 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1808FNL  305 FELLat/Long: 40.241571 / -104.793006Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.241571 / -104.793006Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/18/2013
End Date: 11/20/2013
Reported: 1/14/2014
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/27/2013             Measured TD: 12059 ft.    Vertical TD: 7144 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/27/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/12/2015
Proposed Top PZ Location:Sec:8 Twp: 3N 66W Footage: 1685 FNL  651 FEL
Bottom Hole Location:Sec:8 Twp: 3N 66W Footage: 1685 FNL  1 FWL
Proposed Depth/Form:12057 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 637 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 637 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7458 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 760, Top: 0 ft., Bottom: 7458 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6431 ft., Depth: 12057 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/2/2013
Spud Date:7/19/2013Spud Date Is:ACTUAL
Measured TD:12059 ft.Measured PB depth:12035 ft.
True Vertical TD:7144 ft.True Vertical PB depth:7143 ft.
Top PZ Location:Sec:8 Twp: 3N 66WFootage: 1748 FNL  678 FEL
Bottom Hole Location:Sec:8 Twp: 3N 66WFootage: 1691 FNL  26 FWL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 691 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 258, Top: 0 ft., Bottom: 691 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7509 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 785, Top: 110 ft., Bottom: 7509 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6480 ft., Depth: 12044 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7094 ft.
NIOBRARA7190 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/27/2013                Interval Top: 7532 ft.    Interval Bottom: 12059 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/18/2013Treatment End Date:11/20/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7532-12059. 10981 BBL CROSSLINK GEL,2252 BBL LINEAR GEL,79061 BBL SLICKWATER,92293 BBL TOTAL FLUID 311060# 30/50 OTTAWA/ST. PETERS SAND,2139160# 40/70 OTTAWA/ST. PETERS SAND,2450220# TOTAL SAND.
Total fluid used in treatment (bbls):92293Max pressure during treatment (psi):7356
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):6224Total flowback volume recovered (bbls):1986
Fresh water used in treatment (bbls):86069Disposition method For flowback:RECYCLE
Total proppant used (lbs):2450220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 80
BTU_GAS 1217
CALC_BBLS_OIL 80
CALC_GOR 14000
CALC_MCF_GAS 1120
CASING_PRESS 2400
GRAVITY_OIL 59
MCF_GAS 1120
Perforation Data:
Interval Top:7532 ft.# Of Holes:0
Interval Bottom:12059 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2133
Total Gas Produced (MCF)46252
GOR21684
GOR DeterminationMCFE
Average BOE per Day27.692
Average MCFE per Day160.603

 Federal Financial Assurance  i 

 Tribal Well  i No