|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2024 Measured TD: 9716 ft. Vertical TD: 5762 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/6/2015 | Prop Depth/Form: | 9733 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Sec. 3, 4, 9, 10, 16 | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6116 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 6116 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5966 ft., Depth: 9733 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/23/2013 | Spud Date: | 9/17/2013 | Spud Date Is: | ACTUAL | Measured TD: | 9716 ft. | Measured PB depth: | 9716 ft. | True Vertical TD: | 5762 ft. | True Vertical PB depth: | 5762 ft. | Top PZ Location: | Sec:9 Twp: 9N 58W | Footage: 599 FNL 1070 FEL | Depth | Bottom Hole Location: | Sec:9 Twp: 9N 58W | Footage: 664 FNL 662 FEL | Depth | Log Types: | CBL, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1244 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 523, Top: 0 ft., Bottom: 1244 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6023 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 508, Top: 1042 ft., Bottom: 6023 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6007 ft., Depth: 9701 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2237 ft. | | | | PARKMAN | 3315 ft. | | | | SUSSEX | 3968 ft. | | | | SHANNON | 4388 ft. | | | | TEEPEE BUTTES | 5086 ft. | | | | NIOBRARA | 5738 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/1/2024 Interval Top: 6252 ft. Interval Bottom: 9621 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/17/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/8/2013 | Treatment End Date: | 11/8/2013 | Treatment Summary: | FRAC'D W/2001295 GAL SILVERSTIM AND SLICK WATER AND 2579821 OTTAWA SAND | Total fluid used in treatment (bbls): | 47650 | Max pressure during treatment (psi): | 3607 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 18 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | 2811 | Total flowback volume recovered (bbls): | 8667 | Fresh water used in treatment (bbls): | 44839 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2579821 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6012 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/24/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 355 | BBLS_OIL | 202 | BTU_GAS | 1185 | CALC_BBLS_H2O | 355 | CALC_BBLS_OIL | 202 | CALC_GOR | 119 | CALC_MCF_GAS | 24 | GRAVITY_OIL | 38 | MCF_GAS | 24 | TUBING_PRESS | 230 |
| Perforation Data: | Interval Top: | 6252 ft. | # Of Holes: | 0 | Interval Bottom: | 9621 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 10/2023 - 09/2024 |
Total Oil Produced (Barrels) | 410 |
Total Gas Produced (MCF) | 856 |
GOR | 2087 |
GOR Determination | BOE |
Average BOE per Day | 1.523 |
Average MCFE per Day | 8.829 |
Federal Financial Assurance | i | |
|
|