Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37503
Well Classification: OW Status: PR - 12/1/2019
Well Name/No:HERMAN #36N-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2019
FacilityID:433152LocationID:433154
County:WELD #123Location:SWSE 32 3N66W 6
Field:WATTENBERG - #90750Elevation:4871 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:218FSL  1364 FELLat/Long: 40.174744 / -104.796512Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174744 / -104.796512Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/28/2013
End Date: 12/30/2013
Reported: 2/14/2014
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2019             Measured TD: 12412 ft.    Vertical TD: 7225 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/29/2015
Proposed Top PZ Location:Sec:32 Twp: 3N 66W Footage: 118 FNL  2630 FEL
Bottom Hole Location:Sec:5 Twp: 3N 66W Footage: 486 FSL  2441 FEL
Proposed Depth/Form:12361 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7658 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 7658 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6657 ft., Depth: 12361 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/3/2013
Spud Date:8/13/2013Spud Date Is:ACTUAL
Measured TD:12412 ft.Measured PB depth:12392 ft.
True Vertical TD:7225 ft.True Vertical PB depth:7224 ft.
Top PZ Location:Sec:32 Twp: 3N 66WFootage: 118 FNL  2630 FEL
Bottom Hole Location:Sec:5 Twp: 3N 66WFootage: 486 FSL  2441 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1022 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 383, Top: 0 ft., Bottom: 1022 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7818 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 350 ft., Bottom: 7818 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6656 ft., Depth: 12402 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7305 ft.
NIOBRARA7410 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2019                 Interval Top: 7883 ft.    Interval Bottom: 12412 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/10/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/28/2013Treatment End Date:12/30/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7883-12412. 36 BBL ACID,29565 BBL CROSSLINK GEL,4415 BBL LINEAR GEL,98579 BBL SLICKWATER,132595 BBL TOTAL FLUID 714518# 30/50 OTTAWA/ST. PETERS SAND,2992814# 40/70 OTTAWA/ST. PETERS SAND,3707332# TOTAL SAND.
Total fluid used in treatment (bbls):132595Max pressure during treatment (psi):7609
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):6975Total flowback volume recovered (bbls):6162
Fresh water used in treatment (bbls):125584Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3707332Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/19/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 373
BTU_GAS 1337
CALC_BBLS_OIL 373
CALC_GOR 1134
CALC_MCF_GAS 423
CASING_PRESS 2000
GRAVITY_OIL 48
MCF_GAS 423
Perforation Data:
Interval Top:7883 ft.# Of Holes:0
Interval Bottom:12412 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1682
Total Gas Produced (MCF)54544
GOR32428
GOR DeterminationMCFE
Average BOE per Day31.303
Average MCFE per Day181.567

 Federal Financial Assurance  i 

 Tribal Well  i No