|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2025 Measured TD: 11623 ft. Vertical TD: 7364 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/28/2015 | | Proposed Top PZ Location: | Sec:6 Twp: 3N 68W | Footage: 871 FSL 768 FWL | | Bottom Hole Location: | Sec:6 Twp: 3N 68W | Footage: 746 FSL 489 FEL | | Proposed Depth/Form: | 11710 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30# , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7726 ft., Weight: 26# , Citings Type: PLANNED | | Cement: | Sacks: 437, Top: 500 ft., Bottom: 7726 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11709 ft., Weight: 13.5# , Citings Type: PLANNED | | Cement: | Sacks: 164, Top: 7426 ft., Bottom: 11709 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/17/2014 | | Spud Date: | 6/5/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11623 ft. | Measured PB depth: | 11607 ft. | | True Vertical TD: | 7364 ft. | True Vertical PB depth: | 7364 ft. | | Top PZ Location: | Sec:6 Twp: 3N 68W | Footage: 871 FSL 768 FWL | | Bottom Hole Location: | Sec:6 Twp: 3N 68W | Footage: 746 FSL 489 FEL | | Log Types: | MWD/CBL/(Triple Combo run in API: 123-36900) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 93 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 842 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 352, Top: 0 ft., Bottom: 842 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7692 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 800 ft., Bottom: 7692 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11611 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 6962 ft., Bottom: 11623 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 376 ft. | | | | | SUSSEX | 3919 ft. | | | | | SHANNON | 4393 ft. | | | | | TEEPEE BUTTES | 6090 ft. | | | | | SHARON SPRINGS | 6955 ft. | | | | | NIOBRARA | 7045 ft. | | | | | CODELL-FORT HAYS | 7580 ft. | | | |
Formation NBRR Formation Classification: OW Status: CM - 3/5/2018 Interval Top: 8014 ft. Interval Bottom: 10661 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/13/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 8014 ft. | # Of Holes: | 459 | | Interval Bottom: | 10661 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 3/5/2018 Interval Top: 7714 ft. Interval Bottom: 11560 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 1/13/2015 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/7/2014 | Treatment End Date: | 12/12/2014 | | Treatment Summary: | Stateges 1-6 were treated in the Fort Hays (depths listed above) as well as stages 25-26. Perf/Prod Intrvl for the last two stages: 10,708 (top) 11,560 (bottom) | | Total fluid used in treatment (bbls): | 14503 | Max pressure during treatment (psi): | 7585 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 184 | Total flowback volume recovered (bbls): | 184 | | Fresh water used in treatment (bbls): | 14319 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 797854 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7714 ft. | # Of Holes: | 216 | | Interval Bottom: | 11560 ft. | Hole Size: | 0.4375 in. |
|
Formation NB-FH Formation Classification: OW Status: PR - 10/1/2025 Interval Top: 7714 ft. Interval Bottom: 11560 ft.| Completed Information for Formation NIOBRARA-FT HAYS | | 1st Production Date: | 1/13/2015 | Choke Size: | | | Formation Name: | NIOBRARA-FT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/7/2014 | Treatment End Date: | 12/12/2014 | | Treatment Summary: | Stateges 1-6 were treated in the Fort Hays as well as stages 25-26. Stages 7-24 were treated in the Niobrara formation. | | Total fluid used in treatment (bbls): | 45317 | Max pressure during treatment (psi): | 7585 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 26 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 575 | Total flowback volume recovered (bbls): | 598 | | Fresh water used in treatment (bbls): | 44742 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 797854 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7297 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2015 | Test Method: | FLOW | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1000 | | BBLS_OIL | 35 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 1000 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 5514 | | CALC_MCF_GAS | 193 | | CASING_PRESS | 2349 | | GRAVITY_OIL | 50 | | MCF_GAS | 193 | | TUBING_PRESS | 931 |
| | Perforation Data: | | Interval Top: | 7714 ft. | # Of Holes: | 675 | | Interval Bottom: | 11560 ft. | Hole Size: | 0.4375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1383 |
| Total Gas Produced (MCF) | 4446 |
| GOR | 3214 |
| GOR Determination | BOE |
| Average BOE per Day | 5.864 |
| Average MCFE per Day | 34.024 |
| Federal Financial Assurance | i | |
|
|