|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2025 Measured TD: 9476 ft. Vertical TD: 5695 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/23/2015 | | Proposed Top PZ Location: | Sec:4 Twp: 9N 58W | Footage: 2021 FSL 1128 FEL | | Bottom Hole Location: | Sec:4 Twp: 9N 58W | Footage: 1980 FSL 660 FWL | | Proposed Depth/Form: | 9508 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Please see comments | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6062 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 410, Top: , Bottom: 6062 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5912 ft., Depth: 9508 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/14/2013 | | Spud Date: | 8/9/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 9476 ft. | Measured PB depth: | 9460 ft. | | True Vertical TD: | 5695 ft. | True Vertical PB depth: | 5695 ft. | | Top PZ Location: | Sec:4 Twp: 9N 58W | Footage: 2008 FSL 1179 FEL | | Bottom Hole Location: | Sec:4 Twp: 9N 58W | Footage: 1978 FSL 676 FWL | | Log Types: | CBL, MUD, GR | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1212 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 496, Top: 0 ft., Bottom: 1212 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6033 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 1000 ft., Bottom: 6033 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5963 ft., Depth: 9461 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2203 ft. | | | | | PARKMAN | 3243 ft. | | | | | SUSSEX | 3872 ft. | | | | | SHANNON | 4308 ft. | | | | | TEEPEE BUTTES | 4883 ft. | | | | | NIOBRARA | 5699 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2025 Interval Top: 6158 ft. Interval Bottom: 9316 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/29/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/29/2013 | Treatment End Date: | 10/29/2013 | | Treatment Summary: | FRAC'D W/2032752 GAL PERMSTIM AND SLICK WATER AND 2518452# OTTAWA SAND | | Total fluid used in treatment (bbls): | 48399 | Max pressure during treatment (psi): | 4394 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 17 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 2749 | Total flowback volume recovered (bbls): | 7013 | | Fresh water used in treatment (bbls): | 45650 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2518452 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5968 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/4/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 305 | | BBLS_OIL | 73 | | BTU_GAS | 1155 | | CALC_BBLS_H2O | 305 | | CALC_BBLS_OIL | 73 | | CASING_PRESS | 5 | | GRAVITY_OIL | 38 | | TUBING_PRESS | 205 |
| | Perforation Data: | | Interval Top: | 6158 ft. | # Of Holes: | 0 | | Interval Bottom: | 9316 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2344 |
| Total Gas Produced (MCF) | 2795 |
| GOR | 1192 |
| GOR Determination | BOE |
| Average BOE per Day | 7.757 |
| Average MCFE per Day | 44.986 |
| Federal Financial Assurance | i | |
|
|