|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2024 Measured TD: 9578 ft. Vertical TD: 5629 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/23/2015 | Proposed Top PZ Location: | Sec:4 Twp: 9N 58W | Footage: 2310 FSL 967 FEL | Bottom Hole Location: | Sec:4 Twp: 9N 58W | Footage: 2310 FSL 660 FWL | Proposed Depth/Form: | 9604 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Please see comments | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5998 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: , Bottom: 5998 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5878 ft., Depth: 9604 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 8/8/2013 | Spud Date: | 8/2/2013 | Spud Date Is: | ACTUAL | Measured TD: | 9578 ft. | Measured PB depth: | 9562 ft. | True Vertical TD: | 5629 ft. | True Vertical PB depth: | 5629 ft. | Top PZ Location: | Sec:4 Twp: 9N 58W | Footage: 2305 FSL 1092 FEL | Bottom Hole Location: | Sec:4 Twp: 9N 58W | Footage: 2291 S 671 W | Log Types: | CBL, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 84 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1195 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 542, Top: 0 ft., Bottom: 1195 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5979 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 904 ft., Bottom: 5979 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5873 ft., Depth: 9563 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2208 ft. | | | | PARKMAN | 3267 ft. | | | | SUSSEX | 3896 ft. | | | | SHANNON | 4332 ft. | | | | TEEPEE BUTTES | 4907 ft. | | | | NIOBRARA | 5836 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/1/2024 Interval Top: 6107 ft. Interval Bottom: 9495 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/28/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/28/2013 | Treatment End Date: | 10/28/2013 | Treatment Summary: | FRAC'D W/2031687 GAL PERMSTIM AND SLICK WATER AND 2623209# OTTAWA SAND | Total fluid used in treatment (bbls): | 48374 | Max pressure during treatment (psi): | 4708 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 18 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | 2838 | Total flowback volume recovered (bbls): | 12588 | Fresh water used in treatment (bbls): | 45536 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2623209 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5881 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/10/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 526 | BBLS_OIL | 156 | BTU_GAS | 1087 | CALC_BBLS_H2O | 526 | CALC_BBLS_OIL | 156 | CASING_PRESS | 5 | GRAVITY_OIL | 38 | TUBING_PRESS | 220 |
| Perforation Data: | Interval Top: | 6107 ft. | # Of Holes: | 0 | Interval Bottom: | 9495 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 895 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 2.448 |
Average MCFE per Day | 14.196 |
Federal Financial Assurance | i | |
|
|