Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37362
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:Alm #33U-404
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:432926LocationID:432887
County:WELD #123Location:NENE 33 7N65W 6
Field:WATTENBERG - #90750Elevation:4792 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:878FNL  330 FELLat/Long: 40.535550 / -104.660020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.535554 / -104.660024Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2015
End Date: 6/24/2015
Reported: 7/7/2015
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 11583 ft.    Vertical TD: 7149 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/16/2015
Proposed Top PZ Location:Sec:33 Twp: 7N 65W Footage: 19 FNL  734 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65W Footage: 10 FNL  500 FWL
Proposed Depth/Form:11563 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7731 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7731 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6430 ft., Depth: 11563 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/28/2015
Spud Date:2/13/2015Spud Date Is:ACTUAL
Measured TD:11583 ft.Measured PB depth:11576 ft.
True Vertical TD:7149 ft.True Vertical PB depth:7149 ft.
Top PZ Location:Sec:33 Twp: 7N 65WFootage: 40 FNL  788 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65WFootage: 8 FNL  500 FWL
Log Types:CBL, MWD (DIL in 123-23733)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7558 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 7558 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7308 ft., Depth: 11579 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3786 ft.
SUSSEX4553 ft.
SHANNON5230 ft.
SHARON SPRINGS6740 ft.
NIOBRARA7558 ft.
FORT HAYS9339 ft.
CODELL9924 ft.
CARLILE10108 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/26/2016                 Interval Top: 10108 ft.    Interval Bottom: 10413 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 10108-10413
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10108 ft.# Of Holes:
Interval Bottom:10413 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/26/2016                 Interval Top: 9924 ft.    Interval Bottom: 11583 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 9924-10108, 10434-11583
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9924 ft.# Of Holes:
Interval Bottom:11583 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/26/2016                 Interval Top: 9339 ft.    Interval Bottom: 10434 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 9339-9924, 10413-10434
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9339 ft.# Of Holes:
Interval Bottom:10434 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/26/2016                 Interval Top: 7612 ft.    Interval Bottom: 9339 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7612-9339
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7612 ft.# Of Holes:
Interval Bottom:9339 ft.Hole Size:

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7612 ft.    Interval Bottom: 11583 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:7/10/2015Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/23/2015Treatment End Date:6/24/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 69,513 bbls Gel Fluid: 49,379 bbls Slickwater Fluid: 20,134 bbls Total Proppant: 3,430,821 lbs Silica Proppant: 3,430,821 lbs Method of determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):69513Max pressure during treatment (psi):5448
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4356
Fresh water used in treatment (bbls):69513Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3430821Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7290 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/14/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 553
BBLS_OIL 161
BTU_GAS 50
CALC_BBLS_H2O 553
CALC_BBLS_OIL 161
CALC_GOR 1093
CALC_MCF_GAS 176
CASING_PRESS 1597
GRAVITY_OIL 1275
MCF_GAS 176
TUBING_PRESS 831
Perforation Data:
Interval Top:7612 ft.# Of Holes:
Interval Bottom:11583 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1167
Total Gas Produced (MCF)4427
GOR3793
GOR DeterminationBOE
Average BOE per Day5.257
Average MCFE per Day30.510

 Federal Financial Assurance  i 

 Tribal Well  i No