Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37360
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:Alm #33V-414
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:432924LocationID:432887
County:WELD #123Location:NENE 33 7N65W 6
Field:WATTENBERG - #90750Elevation:4792 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:938FNL  330 FELLat/Long: 40.535390 / -104.660020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.535389 / -104.660022Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/25/2015
End Date: 6/26/2015
Reported: 7/2/2015
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 11511 ft.    Vertical TD: 7130 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/16/2015
Proposed Top PZ Location:Sec:33 Twp: 7N 65W Footage: 737 FNL  734 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65W Footage: 753 FNL  500 FWL
Proposed Depth/Form:11517 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7681 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7681 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6379 ft., Depth: 11517 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/20/2015
Spud Date:3/12/2015Spud Date Is:ACTUAL
Measured TD:11511 ft.Measured PB depth:11504 ft.
True Vertical TD:7130 ft.True Vertical PB depth:7130 ft.
Top PZ Location:Sec:33 Twp: 7N 65WFootage: 748 FNL  843 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65WFootage: 768 FNL  500 FWL
Log Types:CBL, MWD, (DIL in 123-23733)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7550 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 60 ft., Bottom: 7550 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7166 ft., Depth: 11507 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3735 ft.
SUSSEX4516 ft.
SHANNON5175 ft.
SHARON SPRINGS6671 ft.
NIOBRARA6853 ft.
FORT HAYS7550 ft.
CODELL7609 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/26/2016                 Interval Top: 10537 ft.    Interval Bottom: 11511 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 10537-11511
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10537 ft.# Of Holes:
Interval Bottom:11511 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 2/1/2025                  Interval Top: 7619 ft.    Interval Bottom: 11511 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/9/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2015Treatment End Date:6/26/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 77,552 bbls Gel Fluid: 61,371 bbls Slickwater Fluid: 16,181 bbls Total Proppant: 4,387,320 lbs Silica Proppant: 4,387,320 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):77552Max pressure during treatment (psi):4518
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4050
Fresh water used in treatment (bbls):77552Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4387320Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7131 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 462
BBLS_OIL 194
BTU_GAS 1256
CALC_BBLS_H2O 462
CALC_BBLS_OIL 194
CALC_GOR 1123
CALC_MCF_GAS 218
CASING_PRESS 1610
GRAVITY_OIL 50
MCF_GAS 218
TUBING_PRESS 973
Perforation Data:
Interval Top:7619 ft.# Of Holes:
Interval Bottom:11511 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/26/2016                 Interval Top: 7619 ft.    Interval Bottom: 10537 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7619-10537
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7619 ft.# Of Holes:
Interval Bottom:10537 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)1763
Total Gas Produced (MCF)8464
GOR4800
GOR DeterminationBOE
Average BOE per Day8.760
Average MCFE per Day50.800

 Federal Financial Assurance  i 

 Tribal Well  i No