Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37352
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:ALM #33V-314
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:432907LocationID:432887
County:WELD #123Location:NENE 33 7N65W 6
Field:WATTENBERG - #90750Elevation:4792 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:968FNL  330 FELLat/Long: 40.535300 / -104.660020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.535310 / -104.660020Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/26/2015
End Date: 6/27/2015
Reported: 6/30/2015
Days to report: 3
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 11425 ft.    Vertical TD: 7037 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:5/16/2015
Proposed Top PZ Location:Sec:33 Twp: 7N 65W Footage: 1062 FNL  890 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65W Footage: 1077 FNL  500 FWL
Proposed Depth/Form:11448 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7506 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7506 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6308 ft., Depth: 11448 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/29/2015
Spud Date:3/21/2015Spud Date Is:ACTUAL
Measured TD:11425 ft.Measured PB depth:11418 ft.
True Vertical TD:7037 ft.True Vertical PB depth:7037 ft.
Top PZ Location:Sec:33 Twp: 7N 65WFootage: 1062 FNL  890 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65WFootage: 1077 FNL  500 FWL
Log Types:CBL, MWD, (DIL in 123-23733)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7511 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 7511 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7090 ft., Depth: 11421 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3808 ft.
SUSSEX4520 ft.
SHANNON5228 ft.
SHARON SPRINGS6655 ft.
NIOBRARA6891 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7542 ft.    Interval Bottom: 11425 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/8/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2015Treatment End Date:6/27/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 77,720 bbls Gel Fluid: 60,775 bbls Slickwater Fluid: 16,965 bbls Total Proppant: 4,359,766 lbs Silica Proppant: 4,359,766 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):77720Max pressure during treatment (psi):4226
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2485
Fresh water used in treatment (bbls):77720Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4359766Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7063 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 413
BBLS_OIL 250
BTU_GAS 1275
CALC_BBLS_H2O 413
CALC_BBLS_OIL 250
CALC_GOR 1096
CALC_MCF_GAS 274
CASING_PRESS 1530
GRAVITY_OIL 50
MCF_GAS 274
TUBING_PRESS 990
Perforation Data:
Interval Top:7542 ft.# Of Holes:
Interval Bottom:11425 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)1298
Total Gas Produced (MCF)8240
GOR6348
GOR DeterminationBOE
Average BOE per Day7.414
Average MCFE per Day42.995

 Federal Financial Assurance  i 

 Tribal Well  i No