|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2023 Measured TD: 11658 ft. Vertical TD: 7150 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/26/2017 | | Proposed Top PZ Location: | Sec:33 Twp: 7N 65W | Footage: 2512 FNL 734 FEL | | Bottom Hole Location: | Sec:33 Twp: 7N 65W | Footage: 2527 FNL 500 FWL | | Proposed Depth/Form: | 11658 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7811 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7811 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6509 ft., Depth: 11658 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/5/2015 | | Spud Date: | 4/24/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 11658 ft. | Measured PB depth: | 11502 ft. | | True Vertical TD: | 7150 ft. | True Vertical PB depth: | 7152 ft. | | Top PZ Location: | Sec:33 Twp: 7N 65W | Footage: 2518 FNL 796 FEL | | Bottom Hole Location: | Sec:33 Twp: 7N 65W | Footage: 2536 FNL 500 FWL | | Log Types: | CBL, MWD (DIL in 123-23733) | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7691 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 0 ft., Bottom: 7691 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7177 ft., Depth: 11505 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3757 ft. | | | | | SUSSEX | 4517 ft. | | | | | SHANNON | 5202 ft. | | | | | SHARON SPRINGS | 6727 ft. | | | | | NIOBRARA | 6867 ft. | | | | | FORT HAYS | 7346 ft. | | | | | CODELL | 7613 ft. | | | | | CARLILE | 7738 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 9/26/2016 Interval Top: 7738 ft. Interval Bottom: 11658 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/26/2016 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7738-7890, 11065-11658 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | | | Interval Bottom: | 11658 ft. | Hole Size: | |
|
Formation CD-CRL Formation Classification: OW Status: SI - 8/1/2023 Interval Top: 7691 ft. Interval Bottom: 11658 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 7/1/2015 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/17/2015 | Treatment End Date: | 6/18/2015 | | Treatment Summary: | 19 Stage Sliding Sleeve
Total Fluid: 71,602 bbls
Gel Fluid: 54,730 bbls
Slickwater Fluid: 16,872 bbls
Total Proppant: 3,732,260 lbs
Silica Proppant: 3,732,260 lbs
Method for determining flowback: measuring flowback tank volumes | | Total fluid used in treatment (bbls): | 71602 | Max pressure during treatment (psi): | 4163 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 2836 | | Fresh water used in treatment (bbls): | 71602 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3732260 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7198 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/9/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 300 | | BBLS_OIL | 251 | | BTU_GAS | 1275 | | CALC_BBLS_H2O | 300 | | CALC_BBLS_OIL | 251 | | CALC_GOR | 1231 | | CALC_MCF_GAS | 309 | | CASING_PRESS | 1429 | | GRAVITY_OIL | 50 | | MCF_GAS | 309 | | TUBING_PRESS | 872 |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | | | Interval Bottom: | 11658 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 9/26/2016 Interval Top: 7691 ft. Interval Bottom: 11065 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/26/2016 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7691-7738, 7890-11065 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7691 ft. | # Of Holes: | | | Interval Bottom: | 11065 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 11/27/2024 |
| Defined Inactive (SI ) | Y | Defined Inactive 07/31/2023 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|