|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2025 Measured TD: 11959 ft. Vertical TD: 7400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/9/2015 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 1959 FNL 750 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 1889 FNL 460 FWL | | Proposed Depth/Form: | 11935 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7837 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 444, Top: 500 ft., Bottom: 7837 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11936 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 168, Top: 7537 ft., Bottom: 11936 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/9/2014 | | Spud Date: | 12/28/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11959 ft. | Measured PB depth: | 11941 ft. | | True Vertical TD: | 7400 ft. | True Vertical PB depth: | 7400 ft. | | Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 1857 FNL 488 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 1902 FNL 511 FWL | | Log Types: | CBL/MWD/(IND run in API: 123-37306) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 873 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 357, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7612 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 720 ft., Bottom: 7625 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11944 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 6612 ft., Bottom: 11959 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4363 ft. | | | | | SHANNON | 4637 ft. | | | | | TEEPEE BUTTES | 6082 ft. | | | | | SHARON SPRINGS | 7095 ft. | | | | | NIOBRARA | 7542 ft. | | | | | CODELL | 7625 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 8/1/2025 Interval Top: 7641 ft. Interval Bottom: 11894 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/17/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/9/2014 | Treatment End Date: | 6/5/2014 | | Treatment Summary: | Stages 1 - 15 treated with a total of: 76,175 bbls of slickwater and 1,309,466 lbs of 40/70 Sand Proppant | | Total fluid used in treatment (bbls): | 87035 | Max pressure during treatment (psi): | 8230 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | 390 | Total flowback volume recovered (bbls): | 390 | | Fresh water used in treatment (bbls): | 75785 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1309466 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7496 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/24/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 432 | | BBLS_OIL | 233 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 432 | | CALC_BBLS_OIL | 233 | | CALC_GOR | 910 | | CALC_MCF_GAS | 212 | | CASING_PRESS | 2373 | | GRAVITY_OIL | 50 | | MCF_GAS | 212 | | TUBING_PRESS | 1720 |
| | Perforation Data: | | Interval Top: | 7641 ft. | # Of Holes: | 405 | | Interval Bottom: | 11894 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 72 |
| Total Gas Produced (MCF) | 350 |
| GOR | 4861 |
| GOR Determination | BOE |
| Average BOE per Day | 0.359 |
| Average MCFE per Day | 2.088 |
| Federal Financial Assurance | i | |
|
|