|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 11945 ft. Vertical TD: 7402 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/9/2015 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 1250 FNL 748 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 1182 FNL 460 FWL | | Proposed Depth/Form: | 11939 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7840 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 444, Top: 500 ft., Bottom: 7840 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11940 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 168, Top: 7540 ft., Bottom: 11940 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/30/2014 | | Spud Date: | 1/21/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11945 ft. | Measured PB depth: | 11929 ft. | | True Vertical TD: | 7402 ft. | True Vertical PB depth: | 7402 ft. | | Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 1246 FNL 662 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 1189 FNL 483 FWL | | Log Types: | CBL/MWD/IND | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 113 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 909 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 0 ft., Bottom: 919 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7779 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 630 ft., Bottom: 7793 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11933 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 346, Top: 6779 ft., Bottom: 11945 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4364 ft. | | | | | SHANNON | 4638 ft. | | | | | TEEPEE BUTTES | 6083 ft. | | | | | SHARON SPRINGS | 7100 ft. | | | | | NIOBRARA | 7622 ft. | | | | | CODELL | 7691 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 7803 ft. Interval Bottom: 11889 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/17/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/1/2014 | Treatment End Date: | 5/24/2014 | | Treatment Summary: | Stage 1 - 43 treated with a total of: 114558 bbls of Slickwater and 3,790,412 lbs of 40/70 Sand Proppant. | | Total fluid used in treatment (bbls): | 114558 | Max pressure during treatment (psi): | 8275 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 43 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 4575 | Total flowback volume recovered (bbls): | 4575 | | Fresh water used in treatment (bbls): | 109983 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3790412 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7500 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 478 | | BBLS_OIL | 258 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 478 | | CALC_BBLS_OIL | 258 | | CALC_GOR | 946 | | CALC_MCF_GAS | 244 | | CASING_PRESS | 2415 | | GRAVITY_OIL | 50 | | MCF_GAS | 244 | | TUBING_PRESS | 1659 |
| | Perforation Data: | | Interval Top: | 7803 ft. | # Of Holes: | 1164 | | Interval Bottom: | 11889 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2801 |
| Total Gas Produced (MCF) | 37209 |
| GOR | 13284 |
| GOR Determination | BOE |
| Average BOE per Day | 25.325 |
| Average MCFE per Day | 146.887 |
| Federal Financial Assurance | i | |
|
|