|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 2/1/2026 Measured TD: 11958 ft. Vertical TD: 7390 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 2/1/2026 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/9/2015 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 2440 FNL 752 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 2496 FNL 460 FWL | | Proposed Depth/Form: | 11981 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7879 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 447, Top: 500 ft., Bottom: 7879 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11981 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 169, Top: 7579 ft., Bottom: 11981 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/16/2013 | | Spud Date: | 12/2/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11958 ft. | Measured PB depth: | 11942 ft. | | True Vertical TD: | 7390 ft. | True Vertical PB depth: | 7390 ft. | | Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 2507 FNL 543 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 2448 FNL 524 FWL | | Log Types: | CBL/MWD/(IND run in API: 123-37306) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 113 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 347, Top: 0 ft., Bottom: 860 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7711 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 620 ft., Bottom: 7724 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11946 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 353, Top: 6711 ft., Bottom: 11958 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4365 ft. | | | | | SHANNON | 4638 ft. | | | | | TEEPEE BUTTES | 6082 ft. | | | | | SHARON SPRINGS | 7153 ft. | | | | | NIOBRARA | 7725 ft. | | | | | CODELL | 7915 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 2/1/2026 Interval Top: 7726 ft. Interval Bottom: 11897 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/18/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/1/2014 | Treatment End Date: | 5/29/2014 | | Treatment Summary: | Stages 1 - 44 treated with a total of: 234,721 bbls of Slickwater and 3,987,972 lbs of 40/70 Sand Proppant | | Total fluid used in treatment (bbls): | 234721 | Max pressure during treatment (psi): | 8059 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 44 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 4775 | Total flowback volume recovered (bbls): | 794 | | Fresh water used in treatment (bbls): | 229946 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3987972 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7510 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/24/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 434 | | BBLS_OIL | 234 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 434 | | CALC_BBLS_OIL | 234 | | CALC_GOR | 902 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 2524 | | GRAVITY_OIL | 50 | | MCF_GAS | 211 | | TUBING_PRESS | 1719 |
| | Perforation Data: | | Interval Top: | 7726 ft. | # Of Holes: | 1188 | | Interval Bottom: | 11897 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 533 |
| Total Gas Produced (MCF) | 11964 |
| GOR | 22446 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.458 |
| Average MCFE per Day | 37.463 |
| Federal Financial Assurance | i | |
|
|