|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2025 Measured TD: 11924 ft. Vertical TD: 7378 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/9/2015 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 749 FNL 656 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 680 FNL 460 FWL | | Proposed Depth/Form: | 11996 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7908 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 448, Top: 500 ft., Bottom: 7908 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11997 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 168, Top: 7608 ft., Bottom: 11997 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2014 | | Spud Date: | 2/16/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11924 ft. | Measured PB depth: | 11907 ft. | | True Vertical TD: | 7378 ft. | True Vertical PB depth: | 7378 ft. | | Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 823 FNL 676 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 676 FNL 507 FWL | | Log Types: | CBL/MWD/(IND run in API: 123-37306) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 113 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 938 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 366, Top: 0 ft., Bottom: 948 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 658, Top: 430 ft., Bottom: 7810 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11911 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 351, Top: 6797 ft., Bottom: 11924 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4380 ft. | | | | | SHANNON | 4654 ft. | | | | | TEEPEE BUTTES | 6099 ft. | | | | | SHARON SPRINGS | 7117 ft. | | | | | NIOBRARA | 7636 ft. | | | | | CODELL | 7734 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 10/1/2024 Interval Top: 7812 ft. Interval Bottom: 11859 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/17/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/28/2014 | Treatment End Date: | 5/30/2014 | | Treatment Summary: | Stage 1 - 15: treated with a total of: 38096 bbls of slickwater, 24 bbls of 15% HCL acid, and 1,270,857 lbs of 40/70 Sand Proppant | | Total fluid used in treatment (bbls): | 38096 | Max pressure during treatment (psi): | 8376 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 672 | Total flowback volume recovered (bbls): | 672 | | Fresh water used in treatment (bbls): | 37400 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1270857 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7516 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/24/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 424 | | BBLS_OIL | 229 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 424 | | CALC_BBLS_OIL | 229 | | CALC_GOR | 847 | | CALC_MCF_GAS | 194 | | CASING_PRESS | 2356 | | GRAVITY_OIL | 50 | | MCF_GAS | 194 | | TUBING_PRESS | 1633 |
| | Perforation Data: | | Interval Top: | 7812 ft. | # Of Holes: | 405 | | Interval Bottom: | 11859 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 12/12/2024 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|