Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37298
Well Classification: OW Status: PA - 4/25/2025
Well Name/No:Anderson #34R-203
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/25/2025
FacilityID:432818LocationID:432817
County:WELD #123Location:NENE 34 7N66W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FNL  1330 FELLat/Long: 40.538040 / -104.759040Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.538050 / -104.759030Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2014
End Date: 2/9/2014
Reported: 2/12/2014
Days to report: 3
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 4/25/2025             Measured TD: 11650 ft.    Vertical TD: 7184 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 4/25/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/9/2015
Proposed Top PZ Location:Sec:34 Twp: 7N 66W Footage: 818 FNL  1811 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66W Footage: 500 FSL  1436 FEL
Proposed Depth/Form:11658 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7657 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7657 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6453 ft., Depth: 11658 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/22/2013
Spud Date:12/10/2013Spud Date Is:ACTUAL
Measured TD:11650 ft.Measured PB depth:11641 ft.
True Vertical TD:7184 ft.True Vertical PB depth:7184 ft.
Top PZ Location:Sec:34 Twp: 7N 66WFootage: 794 FNL  1833 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66WFootage: 500 FSL  1436 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 932 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 932 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7584 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 606, Top: 0 ft., Bottom: 7584 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7440 ft., Depth: 11645 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3812 ft.
SUSSEX4399 ft.
SHANNON5002 ft.
SHARON SPRINGS6947 ft.
NIOBRARA7128 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 4/25/2025                 Interval Top: 7770 ft.    Interval Bottom: 11517 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/3/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2014Treatment End Date:2/9/2014
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7646' Total Fluid: 60,534 bbls Slickwater Fluid: 12,092 bbls Gel Fluid: 48,442 bbls Total Proppant: 3,647,005 lbs Silica Proppant: 3,647,005 lbs Method for determining flowback volume: measuring flowback tank volumes
Total fluid used in treatment (bbls):60534Max pressure during treatment (psi):7763
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6280
Fresh water used in treatment (bbls):60534Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3647005Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 77
BBLS_OIL 185
BTU_GAS 1396
CALC_BBLS_H2O 77
CALC_BBLS_OIL 185
CALC_GOR 2389
CALC_MCF_GAS 442
CASING_PRESS 1458
GRAVITY_OIL 49
MCF_GAS 442
TUBING_PRESS 715
Perforation Data:
Interval Top:7770 ft.# Of Holes:64
Interval Bottom:11517 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/25/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)173
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.465
Average MCFE per Day2.696

 Federal Financial Assurance  i 

 Tribal Well  i No