Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37272
Well Classification: OW Status: SI - 12/1/2023
Well Name/No:O Investment Properties #6T-421
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2023
FacilityID:432760LocationID:432763
Municipality/County:EATON / WELD #123Location:SESE 6 6N65W 6
Field:WATTENBERG - #90750Elevation:4777 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:500FSL  296 FELLat/Long: 40.511090 / -104.697920Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.511110 / -104.697940Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/8/2013
End Date: 12/9/2013
Reported: 1/3/2014
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2023             Measured TD: 11613 ft.    Vertical TD: 7184 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/29/2015
Proposed Top PZ Location:Sec:6 Twp: 6N 65W Footage: 824 FSL  715 FEL
Bottom Hole Location:Sec:6 Twp: 6N 65W Footage: 501 FNL  828 FEL
Proposed Depth/Form:11629 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7727 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7727 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6421 ft., Depth: 11629 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/17/2013
Spud Date:10/8/2013Spud Date Is:ACTUAL
Measured TD:11613 ft.Measured PB depth:11605 ft.
True Vertical TD:7184 ft.True Vertical PB depth:7184 ft.
Top PZ Location:Sec:6 Twp: 6N 65WFootage: 824 FSL  715 FEL
Bottom Hole Location:Sec:6 Twp: 6N 65WFootage: 501 FNL  828 FEL
Log Types:CBL, MWD (DIL in 123-11545)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 934 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 934 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7564 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 626, Top: 0 ft., Bottom: 7564 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7451 ft., Depth: 11609 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3755 ft.
SUSSEX4479 ft.
SHANNON4997 ft.
SHARON SPRINGS6772 ft.
NIOBRARA6927 ft.
FORT HAYS7615 ft.
CODELL9752 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/28/2019                 Interval Top: 9752 ft.    Interval Bottom: 11613 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 9,752'-11,613'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9752 ft.# Of Holes:
Interval Bottom:11613 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 12/1/2023                 Interval Top: 7615 ft.    Interval Bottom: 11613 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/23/2013Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/8/2013Treatment End Date:12/9/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,615' Total Fluid: 57,054 bbls Slickwater Fluid: 57,054 bbls Total Proppant: 3,672,000 lbs Silica Propppant: 3,672,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):57054Max pressure during treatment (psi):4389
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9210
Fresh water used in treatment (bbls):57054Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3672000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7239 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/8/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 153
BBLS_OIL 149
BTU_GAS 1257
CALC_BBLS_H2O 153
CALC_BBLS_OIL 149
CALC_GOR 812
CALC_MCF_GAS 121
CASING_PRESS 1876
GRAVITY_OIL 46
MCF_GAS 121
TUBING_PRESS 618
Perforation Data:
Interval Top:7615 ft.# Of Holes:
Interval Bottom:11613 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/28/2019                 Interval Top: 7615 ft.    Interval Bottom: 9752 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2019Treatment End Date:N/A
Treatment Summary:Completed depths: 7,615'-9,752'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7615 ft.# Of Holes:
Interval Bottom:9752 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
09/09/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/25/2025
Defined Inactive (SI)YLast Production
11/30/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No