|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2023 Measured TD: 10722 ft. Vertical TD: 6218 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/28/2015 | Prop Depth/Form: | 10712 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-265 , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 77 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 8, Top: 0 ft., Bottom: 77 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1400 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6450 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 715, Top: , Bottom: 6450 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6272 ft., Depth: 10806 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/5/2014 | Spud Date: | 8/27/2014 | Spud Date Is: | ACTUAL | Measured TD: | 10722 ft. | Measured PB depth: | 10650 ft. | True Vertical TD: | 6218 ft. | True Vertical PB depth: | 6217 ft. | Top PZ Location: | Sec:35 Twp: 9N 60W | Footage: 439 FNL 417 FEL | Depth | Bottom Hole Location: | Sec:35 Twp: 9N 60W | Footage: 649 FSL 323 FEL | Depth | Log Types: | MWD, CBL | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 36.9 , Citings Type: ACTUAL | Cement: | Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1456 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 546, Top: 0 ft., Bottom: 1456 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6423 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 588, Top: 630 ft., Bottom: 6423 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5641 ft., Depth: 10700 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 554 ft. | | N | N | PARKMAN | 3425 ft. | 3792 ft. | N | N | SUSSEX | 4127 ft. | 4485 ft. | N | N | SHARON SPRINGS | 6051 ft. | 6237 ft. | N | N | NIOBRARA | 6237 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2023 Interval Top: 6423 ft. Interval Bottom: 10722 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/22/2014 | Choke Size: | 35.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/13/2014 | Treatment End Date: | 10/14/2014 | Treatment Summary: | FRAC STIMULATION IN 15 STAGES THROUGH A PORT AND PACKER SYSTEM WITH 3,255,342 LBS 20/40 SAND AND 49,417 BBLS FRESH WATER. NO GAS OR ACID WAS USED. | Total fluid used in treatment (bbls): | 49717 | Max pressure during treatment (psi): | 6079 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.90 | Type Of gas: | | Number Of staged intervals: | 15 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 18892 | Fresh water used in treatment (bbls): | 49717 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3255342 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6271 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2014 | Test Method: | | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 926 | BBLS_OIL | 279 | BTU_GAS | 1221 | CALC_BBLS_H2O | 926 | CALC_BBLS_OIL | 279 | CASING_PRESS | 165 | GRAVITY_OIL | 35 |
| Perforation Data: | Interval Top: | 6423 ft. | # Of Holes: | | Interval Bottom: | 10722 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3427 |
Total Gas Produced (MCF) | 11982 |
GOR | 3496 |
GOR Determination | BOE |
Average BOE per Day | 15.023 |
Average MCFE per Day | 87.163 |
Federal Financial Assurance | i | |
|
|