Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37149
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:WISHBONE #29N-E24HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:432525LocationID:432526
County:WELD #123Location:SESW 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:320FSL  1940 FWLLat/Long: 40.117410 / -104.728037Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117400 / -104.728040Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/30/2013
End Date: 8/31/2013
Reported: 10/15/2013
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 11910 ft.    Vertical TD: 7346 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/17/2015
Proposed Top PZ Location:Sec:24 Twp: 2N 66W Footage: 626 FSL  1888 FWL
Bottom Hole Location:Sec:24 Twp: 2N 66W Footage: 460 FNL  1888 FWL
Proposed Depth/Form:11828 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1020 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1020 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7616 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 7616 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6619 ft., Depth: 11828 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/4/2013
Spud Date:5/8/2013Spud Date Is:ACTUAL
Measured TD:11910 ft.Measured PB depth:11895 ft.
True Vertical TD:7346 ft.True Vertical PB depth:7344 ft.
Top PZ Location:Sec:24 Twp: 2N 66WFootage: 676 FSL  1945 FWL
Bottom Hole Location:Sec:24 Twp: 2N 66WFootage: 487 FNL  1858 FWL
Log Types:CBL, GR, RES, MUD; FMI
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1043 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 1043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7772 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 70 ft., Bottom: 7772 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6821 ft., Depth: 11895 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7202 ft.
NIOBRARA7280 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7817 ft.    Interval Bottom: 11910 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/19/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/30/2013Treatment End Date:8/27/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7817-11910. 10644 BBL CROSSLINK GEL,1023 BBL LINEAR GEL,68224 BBL SLICKWATER,79891 BBL TOTAL FLUID. 307398# 30/50 OTTAWA/ST. PETERS SAND,1881171# 40/70 OTTAWA/ST. PETERS SAND,2188569# TOTAL SAND.
Total fluid used in treatment (bbls):79891Max pressure during treatment (psi):7044
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14590
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2188569Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 169
BBLS_OIL 170
BTU_GAS 1382
CALC_BBLS_H2O 169
CALC_BBLS_OIL 170
CALC_GOR 2647
CALC_MCF_GAS 450
CASING_PRESS 1834
GRAVITY_OIL 47
MCF_GAS 450
Perforation Data:
Interval Top:7817 ft.# Of Holes:0
Interval Bottom:11910 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)435
Total Gas Produced (MCF)12662
GOR29108
GOR DeterminationMCFE
Average BOE per Day7.083
Average MCFE per Day41.114

 Federal Financial Assurance  i 

 Tribal Well  i No