|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/24/2025 Measured TD: 11919 ft. Vertical TD: 7350 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/24/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/5/2027 | | Proposed Top PZ Location: | Sec:24 Twp: 2N 66W | Footage: 572 FSL 1914 FEL | | Bottom Hole Location: | Sec:24 Twp: 2N 66W | Footage: 485 FNL 1877 FEL | | Proposed Depth/Form: | 11904 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1016 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 377, Top: 0 ft., Bottom: 1016 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7671 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 763, Top: 56 ft., Bottom: 7671 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7541 ft., Depth: 11904 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/29/2013 | | Spud Date: | 5/6/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11919 ft. | Measured PB depth: | 11904 ft. | | True Vertical TD: | 7350 ft. | True Vertical PB depth: | 7350 ft. | | Top PZ Location: | Sec:24 Twp: 2N 66W | Footage: 572 FSL 1914 FEL | | Bottom Hole Location: | Sec:24 Twp: 2N 66W | Footage: 485 FNL 1877 FEL | | Log Types: | CBL; GR; MUD | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1016 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 377, Top: 0 ft., Bottom: 1016 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7671 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 763, Top: 56 ft., Bottom: 7671 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7541 ft., Depth: 11904 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7195 ft. | | | | | NIOBRARA | 7280 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 2/24/2025 Interval Top: 7734 ft. Interval Bottom: 11919 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/11/2025 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 1/29/2025 | Treatment End Date: | 1/31/2025 | | Treatment Summary: | 132 BBL 7.5% HCL ACID; 115,911 BBL SLICKWATER; 116,043 BBL TOTAL FLUID; 294,310 IN-BASIN MP-D1 200 MESH; 935,145 LBS 100 MESH GENOA/SAND HILLS; 1,229,455 LBS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 116043 | Max pressure during treatment (psi): | 4291 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 132 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 115911 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1229455 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/21/2013 | Treatment End Date: | 8/23/2013 | | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7734-11919.
71 BBL ACID,7939 BBL CROSSLINK GEL,822 BBL LINEAR GEL,64257 BBL SLICKWATER,73090 BBL TOTAL FLUID.
224327# 30/50 OTTAWA/ST. PETERS SAND,1758715# 40/70 OTTAWA/ST. PETERS SAND,1983042# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 7734 | Max pressure during treatment (psi): | 7633 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 32 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 9770 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1983042 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 49 | | BBLS_OIL | 19 | | BTU_GAS | 1361 | | CALC_BBLS_H2O | 49 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 17123 | | CALC_MCF_GAS | 319 | | CASING_PRESS | 339 | | GRAVITY_OIL | 71 | | MCF_GAS | 319 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | 0 | | Interval Bottom: | 11919 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3673 |
| Total Gas Produced (MCF) | 43333 |
| GOR | 11797 |
| GOR Determination | BOE |
| Average BOE per Day | 30.407 |
| Average MCFE per Day | 176.366 |
| Federal Financial Assurance | i | |
|
|