Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37111
Well Classification: OW Status: PR - 4/10/2025
Well Name/No:WISHBONE #27C-24HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/10/2025
FacilityID:432445LocationID:432444
County:WELD #123Location:SESE 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5054 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:320FSL  1311 FELLat/Long: 40.117447 / -104.720543Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117447 / -104.720543Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/23/2013
End Date: 8/24/2013
Reported: 10/7/2013
Days to report: 44
Disclosure: Sidetrack #00
Start Date: 1/23/2025
End Date: 1/26/2025
Reported: 3/4/2025
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/10/2025             Measured TD: 12098 ft.    Vertical TD: 7475 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/10/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/5/2027
Proposed Top PZ Location:Sec:24 Twp: 2N 66W Footage: 689 FSL  2368 FEL
Bottom Hole Location:Sec:24 Twp: 2N 66W Footage: 485 FNL  2359 FEL
Proposed Depth/Form:12083 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1032 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 369, Top: 0 ft., Bottom: 1032 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7965 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 793, Top: 0 ft., Bottom: 7965 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7855 ft., Depth: 12083 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/17/2013
Spud Date:5/5/2013Spud Date Is:ACTUAL
Measured TD:12098 ft.Measured PB depth:12074 ft.
True Vertical TD:7475 ft.True Vertical PB depth:7475 ft.
Top PZ Location:Sec:24 Twp: 2N 66WFootage: 689 FSL  2368 FEL
Bottom Hole Location:Sec:24 Twp: 2N 66WFootage: 485 FNL  2359 FEL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1032 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 369, Top: 0 ft., Bottom: 1032 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7965 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 793, Top: 550 ft., Bottom: 7965 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7855 ft., Depth: 12083 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7283 ft.
NIOBRARA7355 ft.
FORT HAYS7844 ft.
CODELL10513 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/1/2020                 Interval Top: 9630 ft.    Interval Bottom: 10167 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:9630-10167
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9630 ft.# Of Holes:0
Interval Bottom:10167 ft.Hole Size:0 in.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 4/10/2025                 Interval Top: 8003 ft.    Interval Bottom: 12098 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2025Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/23/2025Treatment End Date:1/26/2025
Treatment Summary:32 BBL 28% HCL ACID; 66 BBL 7.5% HCL ACID; 127,449 BBL SLICKWATER; 127,547 BBL TOTAL FLUID; 296,000 IN-BASIN MP-D1 200 MESH; 889,767 LBS 100 MESH GENOA/SAND HILLS; 1,185,767 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):127547Max pressure during treatment (psi):5531
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):98Min frac gradient (psi/ft):0.00
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):127449Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1185767Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:10584-12040
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7660 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2025Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 3
BTU_GAS 1361
CALC_BBLS_H2O 14
CALC_BBLS_OIL 3
CALC_GOR 80880
CALC_MCF_GAS 276
CASING_PRESS 450
GRAVITY_OIL 71
MCF_GAS 276
TUBING_PRESS 236
Perforation Data:
Interval Top:8003 ft.# Of Holes:0
Interval Bottom:12098 ft.Hole Size:0 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/1/2020                 Interval Top: 8003 ft.    Interval Bottom: 10584 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:8003-9630, 10167-10584
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8003 ft.# Of Holes:0
Interval Bottom:10584 ft.Hole Size:0 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 3/1/2025                  Interval Top: 8003 ft.    Interval Bottom: 12040 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:9/2/2013Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/23/2013Treatment End Date:8/24/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8003-12040. 11845 BBL CROSSLINK GEL,2798 BBL LINEAR GEL,69985 BBL SLICKWATER,84629 BBL TOTAL FLUID. 357329# 30/50 OTTAWA/ST. PETERS SAND,1626748# 40/70 OTTAWA/ST. PETERS SAND,1984077# TOTAL SAND.
Total fluid used in treatment (bbls):84629Max pressure during treatment (psi):7103
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11030
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1984077Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7554 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/11/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 233
BBLS_OIL 116
BTU_GAS 1382
CALC_BBLS_H2O 233
CALC_BBLS_OIL 116
CALC_GOR 1466
CALC_MCF_GAS 170
CASING_PRESS 2724
GRAVITY_OIL 47
MCF_GAS 170
TUBING_PRESS 2052
Perforation Data:
Interval Top:8003 ft.# Of Holes:0
Interval Bottom:12040 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)560
Total Gas Produced (MCF)20587
GOR36762
GOR DeterminationMCFE
Average BOE per Day11.203
Average MCFE per Day64.987

 Federal Financial Assurance  i 

 Tribal Well  i No