Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37096
Well Classification: OW Status: PR - 7/16/2013
Well Name/No:CASTOR #LD12-78HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/16/2013
FacilityID:432410LocationID:432411
County:WELD #123Location:SWSW 12 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4630 ft.
Planned Location:288FSL  660 FWLLat/Long: 40.759678 / -103.819347Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.759682 / -103.819359Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/26/2013
End Date: 6/27/2013
Reported: 9/25/2013
Days to report: 90
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/16/2013             Measured TD: 9505 ft.    Vertical TD: 5521 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/16/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/3/2015
Prop Depth/Form:9505 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5842 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 5842 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5692 ft., Depth: 9505 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/22/2013
Spud Date:5/16/2013Spud Date Is:ACTUAL
Measured TD:9505 ft.Measured PB depth:9505 ft.
True Vertical TD:5521 ft.True Vertical PB depth:5521 ft.
Top PZ Location:Sec:12 Twp: 9N 58WFootage: 1088 FSL  640 FWLDepth
Bottom Hole Location:Sec:12 Twp: 9N 58WFootage: 673 FNL  660 FWLDepth
Log Types:CBL/Mud/Gamma
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 14 in., Top: 0 ft., Depth: 124 ft., Weight: 113 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1217 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 1217 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5860 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 1550 ft., Bottom: 5860 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5747 ft., Depth: 9490 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2259 ft.
PARKMAN3078 ft.
SUSSEX3640 ft.
SHANNON4373 ft.
NIOBRARA5742 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/16/2013                 Interval Top: 5986 ft.    Interval Bottom: 9422 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/26/2013Treatment End Date:6/26/2013
Treatment Summary:Frac'd the Niobrara w/ 2044492 gals of Vistar and Slick Water with 2758000#'s of Ottawa sand.
Total fluid used in treatment (bbls):48678Max pressure during treatment (psi):3935
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):2914Total flowback volume recovered (bbls):418
Fresh water used in treatment (bbls):45764Disposition method For flowback:RECYCLE
Total proppant used (lbs):2758000Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5747 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 214
BBLS_OIL 220
CALC_BBLS_H2O 214
CALC_BBLS_OIL 220
GRAVITY_OIL 40
TUBING_PRESS 406
Perforation Data:
Interval Top:5986 ft.# Of Holes:0
Interval Bottom:9422 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)7081
Total Gas Produced (MCF)22467
GOR3172
GOR DeterminationBOE
Average BOE per Day29.965
Average MCFE per Day173.821

 Federal Financial Assurance  i 

 Tribal Well  i No