Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37095
Well Classification: OW Status: SI - 9/1/2025
Well Name/No:State North Platte #F-J-26HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2025
FacilityID:432394LocationID:432395
County:WELD #123Location:NWNW 26 5N63W 6
Field:WATTENBERG - #90750Elevation:4565 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:437FNL  956 FWLLat/Long: 40.376290 / -104.409010Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376296 / -104.409017Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/18/2014
End Date: 1/19/2014
Reported: 2/12/2014
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2025             Measured TD: 10994 ft.    Vertical TD: 6498 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/3/2015
Proposed Top PZ Location:Sec:26 Twp: 5N 63W Footage: 631 FNL  1340 FWL
Bottom Hole Location:Sec:26 Twp: 5N 63W Footage: 470 FSL  1340 FWL
Proposed Depth/Form:11071 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36.00 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6954 ft., Weight: 26.00 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6954 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6854 ft., Depth: 11071 ft., Weight: 11.60 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/25/2013
Spud Date:11/16/2013Spud Date Is:ACTUAL
Measured TD:10994 ft.Measured PB depth:10994 ft.
True Vertical TD:6498 ft.True Vertical PB depth:6498 ft.
Top PZ Location:Sec:26 Twp: 5N 63WFootage: 860 FNL  1338 FWL
Bottom Hole Location:Sec:26 Twp: 5N 63WFootage: 475 FSL  1335 FWL
Log Types:CBL, Mud, MWD/LWD, (Resistivity on 123-45097).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 480 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 480 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7033 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 849, Top: 74 ft., Bottom: 7033 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6717 ft., Depth: 10982 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3356 ft.
SHARON SPRINGS6219 ft.NN
NIOBRARA6356 ft.NN
FORT HAYS6791 ft.
CODELL7036 ft.
CARLILE7810 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/8/2018                  Interval Top: 7810 ft.    Interval Bottom: 10660 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/8/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 7810'-8710'; 10130'-10660'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7810 ft.# Of Holes:
Interval Bottom:10660 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  SI - 9/1/2025                  Interval Top: 7104 ft.    Interval Bottom: 10994 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:2/13/2014Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/18/2014Treatment End Date:1/19/2014
Treatment Summary:18-stage completion using sliding sleeves and casing packers; 57849 total bbls fluid pumped: fresh water (Slurry); 4203740 total lbs proppant pumped: 144220 lbs 40/70 Ottawa sand, 3785760 lbs 20/40 Ottawa sand, and 273760 lbs 20/40 Prop Star.
Total fluid used in treatment (bbls):57849Max pressure during treatment (psi):6809
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):25226
Fresh water used in treatment (bbls):57849Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4203740Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6682 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 76
BTU_GAS 1307
CALC_BBLS_H2O 21
CALC_BBLS_OIL 76
CALC_GOR 3658
CALC_MCF_GAS 278
CASING_PRESS 388
GRAVITY_OIL 44
MCF_GAS 278
TUBING_PRESS 270
Perforation Data:
Interval Top:7104 ft.# Of Holes:
Interval Bottom:10994 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/8/2018                  Interval Top: 7104 ft.    Interval Bottom: 10994 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/8/2018Treatment End Date:N/A
Treatment Summary:Producing Intervals: 7104'-7810'; 8710'-10130'; 10660'-10994'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7104 ft.# Of Holes:
Interval Bottom:10994 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)13
GOR6500
GOR DeterminationBOE
Average BOE per Day0.011
Average MCFE per Day0.067

 Federal Financial Assurance  i 

 Tribal Well  i No