Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37047
Well Classification: OW Status: SI - 8/1/2025
Well Name/No:Qualls #3C-28H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:432270LocationID:432240
County:WELD #123Location:SWSW 28 3N68W 6
Field:WATTENBERG - #90750Elevation:4957 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:802FSL  281 FWLLat/Long: 40.191610 / -105.016340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191627 / -105.016343Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/26/2013
End Date: 11/2/2013
Reported: 12/10/2013
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 8/1/2025             Measured TD: 11540 ft.    Vertical TD: 7213 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 8/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/19/2015
Proposed Top PZ Location:Sec:28 Twp: 3N 68W Footage: 1538 FSL  738 FWL
Bottom Hole Location:Sec:28 Twp: 3N 68W Footage: 1486 FSL  460 FEL
Proposed Depth/Form:11643 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7539 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 426, Top: 500 ft., Bottom: 7539 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11643 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 169, Top: 7239 ft., Bottom: 11643 ft.

Wellbore Completed
Completion Date:8/14/2013
Spud Date:7/6/2013Spud Date Is:ACTUAL
Measured TD:11540 ft.Measured PB depth:11516 ft.
True Vertical TD:7213 ft.True Vertical PB depth:7213 ft.
Top PZ Location:Sec:28 Twp: 3N 68WFootage: 1528 FSL  480 FWL
Bottom Hole Location:Sec:28 Twp: 3N 68WFootage: 1491 FSL  486 FEL
Log Types:CBL/MWD/Mud Log/(IND, NEU run in API: 123-10664)
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 65.0 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 841 ft., Weight: 40.00 , Citings Type: ACTUAL
Cement:Sacks: 366, Top: 0 ft., Bottom: 852 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7024 ft., Weight: 26.0 , Citings Type: ACTUAL
Cement:Sacks: 554, Top: 0 ft., Bottom: 7039 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11520 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 7039 ft., Bottom: 11540 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6800 ft.
NIOBRARA6920 ft.
FORT HAYS7338 ft.
CODELL7430 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/2/2013                 Interval Top: 7422 ft.    Interval Bottom: 11473 ft.

 Completed Information for Formation CODELL
1st Production Date:11/25/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2013Treatment End Date:11/2/2013
Treatment Summary:Stages 1-33 treated with 101,697 bbls of slickwater and 2,343,190 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):101697Max pressure during treatment (psi):7691
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:33
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2200
Fresh water used in treatment (bbls):101697Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2343190Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7289 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/2013Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 144
BBLS_OIL 14
BTU_GAS 1340
CALC_BBLS_H2O 144
CALC_BBLS_OIL 14
CALC_GOR 14357
CALC_MCF_GAS 201
CASING_PRESS 2102
GRAVITY_OIL 50
MCF_GAS 201
TUBING_PRESS 1791
Perforation Data:
Interval Top:7422 ft.# Of Holes:1075
Interval Bottom:11473 ft.Hole Size:0.4375 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/17/2018                 Interval Top: 7300 ft.    Interval Bottom: 7383 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/25/2013Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2013Treatment End Date:11/2/2013
Treatment Summary:Stage 34 treated with 2.756 bbls of slickwater and 71,657 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):2756Max pressure during treatment (psi):6817
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2756Disposition method For flowback:
Total proppant used (lbs):71657Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7300 ft.# Of Holes:33
Interval Bottom:7383 ft.Hole Size:0.4375 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  SI - 8/1/2025                  Interval Top: 7179 ft.    Interval Bottom: 11473 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:11/25/2013Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/26/2013Treatment End Date:11/2/2013
Treatment Summary:Stages 1 - 35 treated with 107,996 bbls of slickwater and 2494600 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):107996Max pressure during treatment (psi):7691
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2200
Fresh water used in treatment (bbls):107996Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2494600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7289 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/2013Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 144
BBLS_OIL 14
BTU_GAS 1340
CALC_BBLS_H2O 144
CALC_BBLS_OIL 14
CALC_GOR 14357
CALC_MCF_GAS 201
CASING_PRESS 2102
GRAVITY_OIL 50
MCF_GAS 201
TUBING_PRESS 1791
Perforation Data:
Interval Top:7179 ft.# Of Holes:1140
Interval Bottom:11473 ft.Hole Size:0.4375 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/17/2018                 Interval Top: 7179 ft.    Interval Bottom: 7262 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2013Treatment End Date:11/2/2013
Treatment Summary:Stage 35 treated with 3.543 bbls of slickwater and 79,753 lbs of 40/70 sand proppant.
Total fluid used in treatment (bbls):3543Max pressure during treatment (psi):6994
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3543Disposition method For flowback:
Total proppant used (lbs):79753Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7179 ft.# Of Holes:32
Interval Bottom:7262 ft.Hole Size:0.4375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.003

 Federal Financial Assurance  i 

 Tribal Well  i No