|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2024 Measured TD: 11078 ft. Vertical TD: 6665 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/18/2015 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 63W | Footage: 2310 FNL 726 FEL | | Bottom Hole Location: | Sec:23 Twp: 6N 63W | Footage: 2310 FNL 535 FWL | | Proposed Depth/Form: | 11048 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 585 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 585 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7000 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 7000 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6850 ft., Depth: 11048 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 7/22/2013 | | Spud Date: | 7/15/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11078 ft. | Measured PB depth: | 11078 ft. | | True Vertical TD: | 6665 ft. | True Vertical PB depth: | 6665 ft. | | Top PZ Location: | Sec:23 Twp: 6N 63W | Footage: 2315 FNL 803 FEL | | Bottom Hole Location: | Sec:23 Twp: 6N 63W | Footage: 2324 FNL 535 FWL | | Log Types: | CBL, MUD, GR | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 639 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 639 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6991 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 1140 ft., Bottom: 6991 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6874 ft., Depth: 11063 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1104 ft. | | | | | PARKMAN | 3618 ft. | | | | | SUSSEX | 4432 ft. | | | | | SHANNON | 4957 ft. | | | | | TEEPEE BUTTES | 5959 ft. | | | | | NIOBRARA | 6614 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 2/1/2024 Interval Top: 7115 ft. Interval Bottom: 10983 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/7/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/16/2013 | Treatment End Date: | 8/16/2013 | | Treatment Summary: | FRAC'D W/3357707 GAL PERMSTIM AND SLICK WATER AND 3799579 # OTTAWA SAND | | Total fluid used in treatment (bbls): | 79945 | Max pressure during treatment (psi): | 5739 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 17 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 4110 | Total flowback volume recovered (bbls): | 2580 | | Fresh water used in treatment (bbls): | 75835 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3799579 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6888 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/16/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 207 | | BBLS_OIL | 321 | | BTU_GAS | 1255 | | CALC_BBLS_H2O | 207 | | CALC_BBLS_OIL | 321 | | CALC_GOR | 1389 | | CALC_MCF_GAS | 446 | | GRAVITY_OIL | 44 | | MCF_GAS | 446 | | TUBING_PRESS | 659 |
| | Perforation Data: | | Interval Top: | 7115 ft. | # Of Holes: | 0 | | Interval Bottom: | 10983 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4418 |
| Total Gas Produced (MCF) | 3482 |
| GOR | 788 |
| GOR Determination | BOE |
| Average BOE per Day | 13.765 |
| Average MCFE per Day | 79.839 |
| Federal Financial Assurance | i | |
|
|