Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37010
Well Classification: OW Status: PR - 11/1/2022
Well Name/No:MORNING FRESH #15N-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2022
FacilityID:432207LocationID:432211
County:WELD #123Location:NWNE 15 3N66W 6
Field:WATTENBERG - #90750Elevation:4884 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FNL  1860 FELLat/Long: 40.231526 / -104.760495Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.231539 / -104.760492Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2015
End Date: 1/21/2015
Reported: 3/4/2015
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2022             Measured TD: 12110 ft.    Vertical TD: 7190 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:3/14/2015
Proposed Top PZ Location:Sec:15 Twp: 3N 66W Footage: 686 FNL  2280 FEL
Bottom Hole Location:Sec:15 Twp: 3N 66W Footage: 7 FSL  2280 FEL
Proposed Depth/Form:12151 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 937 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 937 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7553 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7553 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6542 ft., Depth: 12151 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/2/2014
Spud Date:5/11/2014Spud Date Is:ACTUAL
Measured TD:12110 ft.Measured PB depth:12086 ft.
True Vertical TD:7190 ft.True Vertical PB depth:7189 ft.
Top PZ Location:Sec:15 Twp: 3N 66WFootage: 686 FNL  2280 FEL
Bottom Hole Location:Sec:15 Twp: 3N 66WFootage: 7 FSL  2280 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 996 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 376, Top: 0 ft., Bottom: 996 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7569 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 7569 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6614 ft., Depth: 12096 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4544 ft.
SHARON SPRINGS7227 ft.
NIOBRARA7336 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2022                 Interval Top: 7603 ft.    Interval Bottom: 12110 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/30/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/16/2015Treatment End Date:1/21/2015
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7603-12110. 133327 BBL SLICKWATER, 133327 BBL TOTAL FLUID. 173430# 20/40 PREFERRED/PEARL, 3526360# 40/70 OTTAWA/ST. PETERS, 3699790# TOTAL SAND.
Total fluid used in treatment (bbls):133327Max pressure during treatment (psi):7423
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1403
Fresh water used in treatment (bbls):133327Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3699790Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 126
BBLS_OIL 175
BTU_GAS 1203
CALC_BBLS_H2O 126
CALC_BBLS_OIL 175
CALC_GOR 4063
CALC_MCF_GAS 711
CASING_PRESS 1350
GRAVITY_OIL 62
MCF_GAS 711
Perforation Data:
Interval Top:7603 ft.# Of Holes:0
Interval Bottom:12110 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2312
Total Gas Produced (MCF)78113
GOR33785
GOR DeterminationMCFE
Average BOE per Day43.264
Average MCFE per Day250.927

 Federal Financial Assurance  i 

 Tribal Well  i No