Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37007
Well Classification: OW Status: PR - 12/1/2023
Well Name/No:McKINSTRY #2C-21HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2023
FacilityID:432203LocationID:432204
County:WELD #123Location:NENE 22 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:799FNL  500 FELLat/Long: 40.216706 / -104.981399Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.216706 / -104.981399Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/10/2016
End Date: 7/13/2016
Reported: 8/25/2016
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2023             Measured TD: 15007 ft.    Vertical TD: 7262 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2015
Proposed Top PZ Location:Sec:22 Twp: 3N 68W Footage: 647 FNL  198 FEL
Bottom Hole Location:Sec:21 Twp: 3N 68W Footage: 510 FNL  2176 FEL
Proposed Depth/Form:14497 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 388, Top: 0 ft., Bottom: 1018 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7756 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 7756 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6750 ft., Depth: 14986 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 540, Top: 6850 ft., Bottom: 14986 ft.

Wellbore Completed
Completion Date:1/19/2016
Spud Date:1/17/2014Spud Date Is:ACTUAL
Measured TD:15007 ft.Measured PB depth:14955 ft.
True Vertical TD:7262 ft.True Vertical PB depth:7261 ft.
Top PZ Location:Sec:22 Twp: 3N 68WFootage: 659 FNL  222 FEL
Bottom Hole Location:Sec:21 Twp: 3N 68WFootage: 489 FNL  2155 FEL
Log Types:
Log Types:GR, CBL, CCL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 388, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 20 ft., Bottom: 7808 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6674 ft., Depth: 15003 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 6674 ft., Bottom: 15003 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4141 ft.
SHARON SPRINGS7116 ft.
NIOBRARA7203 ft.
FORT HAYS7630 ft.
CODELL7701 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/24/2017                 Interval Top: 12277 ft.    Interval Bottom: 12522 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/24/2017Treatment End Date:N/A
Treatment Summary:FT HAYS 12,277-12,522;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12277 ft.# Of Holes:381
Interval Bottom:12522 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2023                 Interval Top: 7818 ft.    Interval Bottom: 14944 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:8/7/2016Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2016Treatment End Date:7/13/2016
Treatment Summary:PERF AND FRAC FROM 7818-14944. 10 BBL 7.5% HCL ACID, 3,513 BBL PUMP DOWN, 119,163 BBL SLICKWATER, 122,686 BBL TOTAL FLUID 540,579# 100 MESH, 2,974,828# 40/70, - 3,515,407# TOTAL SAND. ENTERED CODELL 7818-12,277; 12,522-14,944 FT HAYS 12,277-12,522; THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):122686Max pressure during treatment (psi):7878
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):10Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9467
Fresh water used in treatment (bbls):122676Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3515407Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 810
BBLS_OIL 124
BTU_GAS 1367
CALC_BBLS_H2O 810
CALC_BBLS_OIL 124
CALC_GOR 1645
CALC_MCF_GAS 204
CASING_PRESS 1500
GRAVITY_OIL 48
MCF_GAS 204
Perforation Data:
Interval Top:7818 ft.# Of Holes:381
Interval Bottom:14944 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/24/2017                 Interval Top: 7818 ft.    Interval Bottom: 14944 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/24/2017Treatment End Date:N/A
Treatment Summary:ENTERED CODELL 7818-12,277; 12,522-14,944
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7818 ft.# Of Holes:381
Interval Bottom:14944 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3686
Total Gas Produced (MCF)82405
GOR22356
GOR DeterminationMCFE
Average BOE per Day48.936
Average MCFE per Day283.829

 Federal Financial Assurance  i 

 Tribal Well  i No