|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2023 Measured TD: 15007 ft. Vertical TD: 7262 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/14/2015 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 647 FNL 198 FEL | | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 510 FNL 2176 FEL | | Proposed Depth/Form: | 14497 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 280, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 388, Top: 0 ft., Bottom: 1018 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7756 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 0 ft., Bottom: 7756 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6750 ft., Depth: 14986 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 6850 ft., Bottom: 14986 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/19/2016 | | Spud Date: | 1/17/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15007 ft. | Measured PB depth: | 14955 ft. | | True Vertical TD: | 7262 ft. | True Vertical PB depth: | 7261 ft. | | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 659 FNL 222 FEL | | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 489 FNL 2155 FEL | | Log Types: | | | Log Types: | GR, CBL, CCL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 388, Top: 0 ft., Bottom: 1018 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7808 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 20 ft., Bottom: 7808 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6674 ft., Depth: 15003 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 6674 ft., Bottom: 15003 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4141 ft. | | | | | SHARON SPRINGS | 7116 ft. | | | | | NIOBRARA | 7203 ft. | | | | | FORT HAYS | 7630 ft. | | | | | CODELL | 7701 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 1/24/2017 Interval Top: 12277 ft. Interval Bottom: 12522 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/24/2017 | Treatment End Date: | N/A | | Treatment Summary: | FT HAYS 12,277-12,522;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 12277 ft. | # Of Holes: | 381 | | Interval Bottom: | 12522 ft. | Hole Size: | 0.46 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 12/1/2023 Interval Top: 7818 ft. Interval Bottom: 14944 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 8/7/2016 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/10/2016 | Treatment End Date: | 7/13/2016 | | Treatment Summary: | PERF AND FRAC FROM 7818-14944.
10 BBL 7.5% HCL ACID, 3,513 BBL PUMP DOWN, 119,163 BBL SLICKWATER, 122,686 BBL TOTAL FLUID
540,579# 100 MESH, 2,974,828# 40/70, - 3,515,407# TOTAL SAND.
ENTERED CODELL 7818-12,277; 12,522-14,944
FT HAYS 12,277-12,522;
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
(SEE ATTACHMENT)
| | Total fluid used in treatment (bbls): | 122686 | Max pressure during treatment (psi): | 7878 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 17 | | Total acid used in treatment (bbls): | 10 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 9467 | | Fresh water used in treatment (bbls): | 122676 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3515407 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/13/2016 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 810 | | BBLS_OIL | 124 | | BTU_GAS | 1367 | | CALC_BBLS_H2O | 810 | | CALC_BBLS_OIL | 124 | | CALC_GOR | 1645 | | CALC_MCF_GAS | 204 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 48 | | MCF_GAS | 204 |
| | Perforation Data: | | Interval Top: | 7818 ft. | # Of Holes: | 381 | | Interval Bottom: | 14944 ft. | Hole Size: | 0.46 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/24/2017 Interval Top: 7818 ft. Interval Bottom: 14944 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/24/2017 | Treatment End Date: | N/A | | Treatment Summary: | ENTERED CODELL 7818-12,277; 12,522-14,944
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7818 ft. | # Of Holes: | 381 | | Interval Bottom: | 14944 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3686 |
| Total Gas Produced (MCF) | 82405 |
| GOR | 22356 |
| GOR Determination | MCFE |
| Average BOE per Day | 48.936 |
| Average MCFE per Day | 283.829 |
| Federal Financial Assurance | i | |
|
|