Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36982
Well Classification: OW Status: SI - 11/1/2025
Well Name/No:Billings #3B-18H L368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:432160LocationID:432004
County:WELD #123Location:NWSW 18 3N68W 6
Field:WATTENBERG - #90750Elevation:5155 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1630FSL  952 FWLLat/Long: 40.222704 / -105.051741Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.222703 / -105.051740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2015
End Date: 1/17/2015
Reported: 2/12/2016
Originally Reported: 2/26/2015
Days to report: 391
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2025             Measured TD: 14105 ft.    Vertical TD: 7329 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/13/2015
Proposed Top PZ Location:Sec:18 Twp: 3N 68W Footage: 2228 FSL  879 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68W Footage: 2126 FSL  1929 FWL
Proposed Depth/Form:14387 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7683 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 435, Top: 500 ft., Bottom: 7683 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14387 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 267, Top: 7383 ft., Bottom: 14387 ft.

Wellbore Completed
Completion Date:11/1/2014
Spud Date:10/11/2014Spud Date Is:ACTUAL
Measured TD:14105 ft.Measured PB depth:14034 ft.
True Vertical TD:7329 ft.True Vertical PB depth:7329 ft.
Top PZ Location:Sec:18 Twp: 3N 68WFootage: 2228 FSL  879 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68WFootage: 2126 FSL  1929 FWL
Log Types:CBL, MWD, MUD
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 156 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 155 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 867 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 373, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7609 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 667, Top: 600 ft., Bottom: 7630 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14085 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 4267 ft., Bottom: 14105 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6975 ft.
NIOBRARA7047 ft.
FORT HAYS7829 ft.
CODELL7992 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/11/2017                 Interval Top: 8031 ft.    Interval Bottom: 14034 ft.

 Completed Information for Formation CODELL
1st Production Date:3/27/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 1-16 and 18-40 are in the Codell formation. The perforation intervals for the Codell are: 8,031 - 11,488 and 11,731 - 14,034.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8031 ft.# Of Holes:1128
Interval Bottom:14034 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/11/2017                 Interval Top: 7831 ft.    Interval Bottom: 11683 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/27/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/14/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 17, and 41-42 are in the Ft Hays formation. The performation intervals for the Ft Hays are: 7,831 - 7,983 and 11,532 - 11,683. This formation was treated on 1/14/15 and 1/18/15.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7831 ft.# Of Holes:1128
Interval Bottom:11683 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  SI - 11/1/2025                 Interval Top: 7627 ft.    Interval Bottom: 14034 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:3/27/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2015Treatment End Date:1/18/2015
Treatment Summary:Stages 1 - 43 treated with 87,048 bbls of total fluids, 86,585 bbls of fresh water, 415 bbls of slickwater, 48 bbls of 15%HCL acid, and 3,949,005 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):87048Max pressure during treatment (psi):8679
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4400
Fresh water used in treatment (bbls):87000Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3949005Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7174 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 633
BBLS_OIL 142
BTU_GAS 1298
CALC_BBLS_H2O 633
CALC_BBLS_OIL 142
CALC_GOR 1134
CALC_MCF_GAS 161
CASING_PRESS 2081
GRAVITY_OIL 50
MCF_GAS 161
TUBING_PRESS 1320
Perforation Data:
Interval Top:7627 ft.# Of Holes:1128
Interval Bottom:14034 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/11/2017                 Interval Top: 7627 ft.    Interval Bottom: 7783 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/18/2015Treatment End Date:1/18/2015
Treatment Summary:Stage 43 is in the Niobrara formation. The perforation interval is 7,627 - 7,783.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7627 ft.# Of Holes:1128
Interval Bottom:7783 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.019

 Federal Financial Assurance  i 

 Tribal Well  i No