Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36964
Well Classification: OW Status: PR - 10/1/2021
Well Name/No:Waste Management #2T-221
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2021
FacilityID:432130LocationID:432133
County:WELD #123Location:SESE 2 2N64W 6
Field:WATTENBERG - #90750Elevation:4893 ft.
Planned Location:230FSL  1046 FELLat/Long: 40.160780 / -104.512870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.160790 / -104.512870Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/27/2013
End Date: 10/28/2013
Reported: 11/1/2013
Days to report: 4
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2021             Measured TD: 11189 ft.    Vertical TD: 6724 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/13/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 64W Footage: 821 FSL  797 FEL
Bottom Hole Location:Sec:2 Twp: 2N 64W Footage: 500 FNL  820 FEL
Proposed Depth/Form:11183 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7223 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7223 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6016 ft., Depth: 11183 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/1/2013
Spud Date:8/19/2013Spud Date Is:ACTUAL
Measured TD:11189 ft.Measured PB depth:11181 ft.
True Vertical TD:6724 ft.True Vertical PB depth:6724 ft.
Top PZ Location:Sec:2 Twp: 2N 64WFootage: 862 FSL  768 FEL
Bottom Hole Location:Sec:2 Twp: 2N 64WFootage: 500 N  812 E
Log Types:CBL, MUD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 942 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 0 ft., Bottom: 942 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7178 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 659, Top: 0 ft., Bottom: 7178 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7054 ft., Depth: 11185 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3831 ft.
SUSSEX4351 ft.
SHANNON5156 ft.
SHARON SPRINGS6624 ft.
NIOBRARA6799 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2024                 Interval Top: 7260 ft.    Interval Bottom: 11189 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/8/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/27/2013Treatment End Date:10/28/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,260' Total Fluid: 60,002 Gel Fluid: 47,888 bbls Slickwater Fluid: 12,114 bbls Total Proppant: 3,675,760 lbs Silica Proppant: 3,675,760 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):60002Max pressure during treatment (psi):3858
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):861
Fresh water used in treatment (bbls):60002Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3675760Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6782 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 60
BBLS_OIL 269
BTU_GAS 1337
CALC_BBLS_H2O 60
CALC_BBLS_OIL 269
CALC_GOR 963
CALC_MCF_GAS 259
CASING_PRESS 1110
GRAVITY_OIL 44
MCF_GAS 259
TUBING_PRESS 745
Perforation Data:
Interval Top:7260 ft.# Of Holes:
Interval Bottom:11189 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1657
Total Gas Produced (MCF)14610
GOR8817
GOR DeterminationBOE
Average BOE per Day11.378
Average MCFE per Day66.003

 Federal Financial Assurance  i 

 Tribal Well  i No