Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36962
Well Classification: OW Status: SI - 3/1/2024
Well Name/No:WASTE MANAGEMENT #2T-301
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2024
FacilityID:432128LocationID:432133
County:WELD #123Location:SESE 2 2N64W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Planned Location:230FSL  1326 FELLat/Long: 40.160780 / -104.513870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.160800 / -104.513880Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/23/2013
End Date: 10/24/2013
Reported: 11/1/2013
Days to report: 8
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2024             Measured TD: 11316 ft.    Vertical TD: 6864 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/13/2015
Proposed Top PZ Location:Sec:2 Twp: 2N 64W Footage: 822 FSL  1501 FEL
Bottom Hole Location:Sec:2 Twp: 2N 64W Footage: 500 FNL  1490 FEL
Proposed Depth/Form:11300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7341 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7341 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6133 ft., Depth: 11300 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/29/2013
Spud Date:7/17/2013Spud Date Is:ACTUAL
Measured TD:11316 ft.Measured PB depth:11308 ft.
True Vertical TD:6864 ft.True Vertical PB depth:6864 ft.
Top PZ Location:Sec:2 Twp: 2N 64WFootage: 791 FSL  1456 FEL
Bottom Hole Location:Sec:2 Twp: 2N 64WFootage: 500 N  1528 E
Log Types:CBL, MUD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 938 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 938 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7258 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 628, Top: 800 ft., Bottom: 7258 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7144 ft., Depth: 11312 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3857 ft.
SUSSEX4357 ft.
SHANNON5157 ft.
SHARON SPRINGS6612 ft.
NIOBRARA6737 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 3/1/2024                  Interval Top: 7309 ft.    Interval Bottom: 11316 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/4/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/23/2013Treatment End Date:10/24/2013
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,309' Total Fluid: 58,472 bbls Gel Fluid: 46,818 bbls Slickwater Fluid: 11,654 bbls Total Proppant: 3,637,100 lbs Silica Proppant: 3,637,100 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):58472Max pressure during treatment (psi):3628
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1620
Fresh water used in treatment (bbls):58472Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3637100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6959 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/27/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 354
BTU_GAS 1315
CALC_BBLS_H2O 30
CALC_BBLS_OIL 354
CALC_GOR 864
CALC_MCF_GAS 306
CASING_PRESS 1402
GRAVITY_OIL 44
MCF_GAS 306
TUBING_PRESS 703
Perforation Data:
Interval Top:7309 ft.# Of Holes:
Interval Bottom:11316 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)26
GOR
GOR DeterminationMCFE
Average BOE per Day0.011
Average MCFE per Day0.075

 Federal Financial Assurance  i 

 Tribal Well  i No