Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36918
Well Classification: OW Status: SI - 12/1/2025
Well Name/No:North Platte #T-P-13HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:432037LocationID:310744
County:WELD #123Location:SESE 13 5N63W 6
Field:WATTENBERG - #90750Elevation:4596 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:672FSL  621 FELLat/Long: 40.393690 / -104.377340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.393690 / -104.377340Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/23/2013
End Date: 7/24/2013
Reported: 8/26/2013
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2025             Measured TD: 11116 ft.    Vertical TD: 6338 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:13 Twp: 5N 63w Footage: 631 FSL  1400 FEL
Bottom Hole Location:Sec:13 Twp: 5N 63W Footage: 470 FNL  1350 FEL
Proposed Depth/Form:11119 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36.00 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6835 ft., Weight: 26.00 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6835 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6735 ft., Depth: 11119 ft., Weight: 11.60 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/10/2013
Spud Date:6/26/2013Spud Date Is:ACTUAL
Measured TD:11116 ft.Measured PB depth:11116 ft.
True Vertical TD:6338 ft.True Vertical PB depth:6338 ft.
Top PZ Location:Sec:13 Twp: 5N 63WFootage: 735 FSL  1395 FEL
Bottom Hole Location:Sec:13 Twp: 5N 63WFootage: 472 FNL  1341 FEL
Log Types:CBL, Mud Log, MWD/LWD, (CNL on 123-42483).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 455 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 465 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 6810 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 826, Top: 980 ft., Bottom: 6810 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6599 ft., Depth: 11116 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6260 ft.
NIOBRARA6392 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 12/1/2025                 Interval Top: 6931 ft.    Interval Bottom: 11116 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/5/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/23/2013Treatment End Date:7/24/2013
Treatment Summary:18-stage completion using sliding sleeves and casing packers; 55360 total bbls fluid pumped: all fresh water; 4232800 total lbs proppant pumped: all sand.
Total fluid used in treatment (bbls):55360Max pressure during treatment (psi):5550
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13893
Fresh water used in treatment (bbls):55360Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4232800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:7.375 in.Tubing Setting Depth:6519 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2013Test Method:Flowing
Hours Tested:72Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 144
BBLS_OIL 825
BTU_GAS 1311
CALC_BBLS_H2O 48
CALC_BBLS_OIL 275
CALC_GOR 1316
CALC_MCF_GAS 362
CASING_PRESS 918
GRAVITY_OIL 43
MCF_GAS 1086
TUBING_PRESS 464
Perforation Data:
Interval Top:6931 ft.# Of Holes:
Interval Bottom:11116 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1609
Total Gas Produced (MCF)10563
GOR6564
GOR DeterminationBOE
Average BOE per Day9.410
Average MCFE per Day54.584

 Federal Financial Assurance  i 

 Tribal Well  i No