Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36896
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:USA FED #04N-36HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:432009LocationID:336318
County:WELD #123Location:SWSW 36 3N66W 6
Field:WATTENBERG - #90750Elevation:5024 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:767FSL  591 FWLLat/Long: 40.176749 / -104.732877Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176755 / -104.732911Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/15/2013
End Date: 12/17/2013
Reported: 2/11/2014
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 11808 ft.    Vertical TD: 7275 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:36 Twp: 3N 66W Footage: 648 FSL  680 FWL
Bottom Hole Location:Sec:36 Twp: 3N 66W Footage: 485 FNL  687 FWL
Proposed Depth/Form:11835 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 880 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 880 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7688 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: 0 ft., Bottom: 7688 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6609 ft., Depth: 11835 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/8/2013
Spud Date:9/19/2013Spud Date Is:ACTUAL
Measured TD:11808 ft.Measured PB depth:11789 ft.
True Vertical TD:7275 ft.True Vertical PB depth:7275 ft.
Top PZ Location:Sec:36 Twp: 3N 66WFootage: 648 FSL  680 FWL
Bottom Hole Location:Sec:36 Twp: 3N 66WFootage: 485 FNL  687 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 937 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 937 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7699 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 105 ft., Bottom: 7699 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6769 ft., Depth: 11798 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7196 ft.
NIOBRARA7312 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7729 ft.    Interval Bottom: 11808 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/8/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/15/2013Treatment End Date:12/17/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7729-11808. 10358 BBL CROSSLINK GEL,1194 BBL LINEAR GEL,105096 BBL SLICKWATER,116648 BBL TOTAL FLUID 315348# 30/50 OTTAWA/ST. PETERS SAND,3071751# 40/70 OTTAWA/ST. PETERS SAND,3387099# TOTAL SAND.
Total fluid used in treatment (bbls):116648Max pressure during treatment (psi):7741
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):7465Total flowback volume recovered (bbls):5790
Fresh water used in treatment (bbls):109183Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3387099Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/16/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 48
BTU_GAS 1289
CALC_BBLS_OIL 48
CALC_GOR 5896
CALC_MCF_GAS 283
CASING_PRESS 1251
GRAVITY_OIL 53
MCF_GAS 283
TUBING_PRESS 2124
Perforation Data:
Interval Top:7729 ft.# Of Holes:0
Interval Bottom:11808 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2235
Total Gas Produced (MCF)26353
GOR11791
GOR DeterminationBOE
Average BOE per Day18.456
Average MCFE per Day107.043

 Federal Financial Assurance  i 

 Tribal Well  i No