Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36890
Well Classification: OW Status: SI - 11/1/2025
Well Name/No:Billings #3D-18H L368
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:432002LocationID:432004
County:WELD #123Location:NWSW 18 3N68W 6
Field:WATTENBERG - #90750Elevation:5155 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1610FSL  952 FWLLat/Long: 40.222649 / -105.051741Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.222649 / -105.051740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/8/2015
End Date: 1/24/2015
Reported: 3/16/2015
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2025             Measured TD: 14175 ft.    Vertical TD: 7306 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:18 Twp: 3N 68W Footage: 1545 FSL  856 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68W Footage: 1431 FSL  1941 FWL
Proposed Depth/Form:14387 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7670 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 434, Top: 500 ft., Bottom: 7670 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14387 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 267, Top: 7370 ft., Bottom: 14387 ft.

Wellbore Completed
Completion Date:11/19/2014
Spud Date:10/10/2014Spud Date Is:ACTUAL
Measured TD:14175 ft.Measured PB depth:14102 ft.
True Vertical TD:7306 ft.True Vertical PB depth:7306 ft.
Top PZ Location:Sec:18 Twp: 3N 68WFootage: 1545 FSL  856 FWL
Bottom Hole Location:Sec:17 Twp: 3N 68WFootage: 1431 FSL  1941 FWL
Log Types:CBL, MWD.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 156 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 156 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 391, Top: 0 ft., Bottom: 890 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7638 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 669, Top: 80 ft., Bottom: 7660 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14153 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 619, Top: 5642 ft., Bottom: 14175 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6884 ft.
NIOBRARA7000 ft.
FORT HAYS7453 ft.
CODELL7517 ft.
CARLILE7632 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/12/2017                 Interval Top: 9924 ft.    Interval Bottom: 14101 ft.

 Completed Information for Formation CODELL
1st Production Date:3/27/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9924 ft.# Of Holes:1134
Interval Bottom:14101 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/12/2017                 Interval Top: 7661 ft.    Interval Bottom: 9876 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/27/2015Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7661 ft.# Of Holes:1134
Interval Bottom:9876 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  SI - 11/1/2025                 Interval Top: 7661 ft.    Interval Bottom: 14101 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:3/27/2015Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/8/2015Treatment End Date:1/24/2015
Treatment Summary:Stages 1 - 43 treated with 80,967 bbls of total fluids (slickwater), 80570 bbl fresh water, 397 bbls of additives, and 4,280,138 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):80967Max pressure during treatment (psi):8448
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4400
Fresh water used in treatment (bbls):80967Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4280138Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7279 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2015Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 636
BBLS_OIL 143
BTU_GAS 1298
CALC_BBLS_H2O 636
CALC_BBLS_OIL 143
CALC_GOR 1476
CALC_MCF_GAS 211
CASING_PRESS 2406
GRAVITY_OIL 50
MCF_GAS 211
TUBING_PRESS 1621
Perforation Data:
Interval Top:7661 ft.# Of Holes:1134
Interval Bottom:14101 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.016

 Federal Financial Assurance  i 

 Tribal Well  i No