Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36888
Well Classification: OW Status: PR - 6/1/2022
Well Name/No:USA FED #27N WEST-36HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2022
FacilityID:431998LocationID:336303
County:WELD #123Location:SWSE 36 3N66W 6
Field:WATTENBERG - #90750Elevation:4996 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:661FSL  1931 FELLat/Long: 40.176496 / -104.722742Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176496 / -104.722742Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2014
End Date: 1/12/2014
Reported: 3/5/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2022             Measured TD: 11765 ft.    Vertical TD: 7180 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2015
Proposed Top PZ Location:Sec:36 Twp: 3N 66W Footage: 617 FSL  1740 FEL
Bottom Hole Location:Sec:36 Twp: 3N 66W Footage: 460 FNL  1740 FEL
Proposed Depth/Form:11728 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7540 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7540 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6474 ft., Depth: 11728 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/13/2013
Spud Date:9/16/2013Spud Date Is:ACTUAL
Measured TD:11765 ft.Measured PB depth:11741 ft.
True Vertical TD:7180 ft.True Vertical PB depth:7182 ft.
Top PZ Location:Sec:36 Twp: 3N 66WFootage: 568 FSL  1581 FEL
Bottom Hole Location:Sec:36 Twp: 3N 66WFootage: 514 FNL  1594 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 885 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 885 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7571 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 794, Top: 50 ft., Bottom: 7571 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6646 ft., Depth: 11750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7150 ft.
NIOBRARA7261 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2022                  Interval Top: 7639 ft.    Interval Bottom: 11765 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/24/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/10/2014Treatment End Date:1/12/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7639-11765. 14753 BBL CROSSLINK GEL,1495 BBL LINERAR GEL,104388 BBL SLICKWATER,120636 BBL TOTAL FLUID 444270# 30/50 OTTAWA/ST. PETERS SAND,3041260# 40/70 OTTAWA/ST. PETERS SAND,3485530# TOTAL SAND.
Total fluid used in treatment (bbls):120636Max pressure during treatment (psi):7136
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):7915Total flowback volume recovered (bbls):1000
Fresh water used in treatment (bbls):112721Disposition method For flowback:RECYCLE
Total proppant used (lbs):3485530Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/13/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 230
BTU_GAS 1289
CALC_BBLS_OIL 230
CALC_GOR 3965
CALC_MCF_GAS 912
CASING_PRESS 1700
GRAVITY_OIL 53
MCF_GAS 912
Perforation Data:
Interval Top:7639 ft.# Of Holes:0
Interval Bottom:11765 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2112
Total Gas Produced (MCF)37602
GOR17803
GOR DeterminationMCFE
Average BOE per Day23.475
Average MCFE per Day136.161

 Federal Financial Assurance  i 

 Tribal Well  i No