Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36872
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:THOMSEN #36N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:431931LocationID:431932
County:WELD #123Location:SENW 7 2N65W 6
Field:WATTENBERG - #90750Elevation:4952 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2379FNL  1861 FWLLat/Long: 40.153758 / -104.709216Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153760 / -104.709216Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2013
End Date: 8/14/2013
Reported: 10/8/2013
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 14693 ft.    Vertical TD: 7227 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/21/2015
Proposed Top PZ Location:Sec:7 Twp: 2N 65W Footage: 2130 FSL  2583 FEL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 460 FSL  2563 FEL
Proposed Depth/Form:14648 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 930 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 930 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7629 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 770, Top: , Bottom: 7629 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6640 ft., Depth: 14648 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/11/2013
Spud Date:3/12/2013Spud Date Is:ACTUAL
Measured TD:14693 ft.Measured PB depth:14588 ft.
True Vertical TD:7227 ft.True Vertical PB depth:7226 ft.
Top PZ Location:Sec:7 Twp: 2N 66WFootage: 2097 FNL  2656 FEL
Bottom Hole Location:Sec:18 Twp: 2N 66WFootage: 486 FSL  2543 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 975 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 349, Top: 0 ft., Bottom: 975 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7724 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 775, Top: 260 ft., Bottom: 7724 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.5 in., Size: 4.5 in., Top: 6515 ft., Depth: 14693 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 6400 ft., Bottom: 14693 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7189 ft.
NIOBRARA7316 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 7754 ft.    Interval Bottom: 14570 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/2/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/5/2013Treatment End Date:8/14/2013
Treatment Summary:PERF AND FRAC FROM 14310-14570. 513 BBL ACID,139838 BBL SLICKWATER,140351 BBL TOTAL FLUID. 4120702# 40/70 OTTAWA/ST. PETERS SAND,4120702# TOTAL SAND.
Total fluid used in treatment (bbls):140351Max pressure during treatment (psi):7314
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):513Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):1940Total flowback volume recovered (bbls):14186
Fresh water used in treatment (bbls):137898Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4120702Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7208 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 137
BBLS_OIL 355
BTU_GAS 1274
CALC_BBLS_H2O 137
CALC_BBLS_OIL 355
CALC_GOR 1797
CALC_MCF_GAS 638
CASING_PRESS 2426
GRAVITY_OIL 49
MCF_GAS 638
TUBING_PRESS 1921
Perforation Data:
Interval Top:7754 ft.# Of Holes:1620
Interval Bottom:14570 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3821
Total Gas Produced (MCF)48649
GOR12732
GOR DeterminationBOE
Average BOE per Day33.791
Average MCFE per Day195.957

 Federal Financial Assurance  i 

 Tribal Well  i No