Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36843
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:USA FED #27N EAST-36HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:431892LocationID:336117
County:WELD #123Location:SESE 36 3N66W 6
Field:WATTENBERG - #90750Elevation:4986 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:599FSL  681 FELLat/Long: 40.176343 / -104.718272Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176343 / -104.718272Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/14/2014
End Date: 1/16/2014
Reported: 3/7/2014
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 11705 ft.    Vertical TD: 7166 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/21/2015
Proposed Top PZ Location:Sec:36 Twp: 3N 66W Footage: 625 FSL  1095 FEL
Bottom Hole Location:Sec:36 Twp: 3N 66W Footage: 460 FNL  1095 FEL
Proposed Depth/Form:11704 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 840 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 840 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7555 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 7555 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6552 ft., Depth: 11737 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/23/2013
Spud Date:7/9/2013Spud Date Is:ACTUAL
Measured TD:11705 ft.Measured PB depth:11686 ft.
True Vertical TD:7166 ft.True Vertical PB depth:7166 ft.
Top PZ Location:Sec:36 Twp: 3N 66WFootage: 667 FSL  1088 FEL
Bottom Hole Location:Sec:36 Twp: 3N 66WFootage: 460 FNL  1095 FEL
Log Types:CBL, GR, MUD. RES
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 868 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 309, Top: 0 ft., Bottom: 868 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7588 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 0 ft., Bottom: 7588 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6614 ft., Depth: 11695 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7198 ft.
NIOBRARA7314 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2018                 Interval Top: 7620 ft.    Interval Bottom: 11705 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/24/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/14/2014Treatment End Date:1/16/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7620-11705. 60 BBL 15% HCL,17878 BBL CROSSLINK GEL,2325 BBL LINEAR GEL,104558 BBL SLICKWATER,124821 BBL TOTAL FLUID 49260# 100 MESH OTTAWA/ST. PETERS SAND,526100# 30/50 OTTAWA/ST. PETERS SAND,2934540# 40/70 OTTAWA/ST. PETERS SAND,3509900# TOTAL SAND.
Total fluid used in treatment (bbls):124821Max pressure during treatment (psi):8159
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):6800Total flowback volume recovered (bbls):944
Fresh water used in treatment (bbls):117961Disposition method For flowback:RECYCLE
Total proppant used (lbs):3509900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 85
BTU_GAS 1289
CALC_BBLS_OIL 85
CALC_GOR 1694
CALC_MCF_GAS 144
CASING_PRESS 2750
GRAVITY_OIL 53
MCF_GAS 144
Perforation Data:
Interval Top:7620 ft.# Of Holes:0
Interval Bottom:11705 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3220
Total Gas Produced (MCF)66218
GOR20564
GOR DeterminationMCFE
Average BOE per Day39.908
Average MCFE per Day231.480

 Federal Financial Assurance  i 

 Tribal Well  i No