|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2021 Measured TD: 11173 ft. Vertical TD: 6504 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/20/2015 | | Proposed Top PZ Location: | Sec:8 Twp: 7N 61W | Footage: 1589 FNL 658 FWL | | Bottom Hole Location: | Sec:8 Twp: 7N 61W | Footage: 1600 FSL 660 FEL | | Proposed Depth/Form: | 11193 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-51 , Unit Acreage: 640, Drill Unit: Sec 8-7N-61W | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 50 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 660 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 271, Top: 0 ft., Bottom: 660 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6783 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 795, Top: 0 ft., Bottom: 6783 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5800 ft., Depth: 11010 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/30/2013 | | Spud Date: | 4/19/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11173 ft. | Measured PB depth: | 11173 ft. | | True Vertical TD: | 6504 ft. | True Vertical PB depth: | 6504 ft. | | Top PZ Location: | Sec:8 Twp: 7N 61W | Footage: 1708 FNL 792 FWL | | Bottom Hole Location: | Sec:8 Twp: 7N 61W | Footage: 1648 FSL 718 FEL | | Log Types: | CBL/VDL, CCL, GR; XIPE Calper logs | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 102 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 102 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 685 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 245, Top: 0 ft., Bottom: 685 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6927 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 230 ft., Bottom: 6927 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5864 ft., Depth: 11045 ft., Weight: 12 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 6285 ft. | 6260 ft. | | | | NIOBRARA | 6486 ft. | 6402 ft. | | |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2021 Interval Top: 6927 ft. Interval Bottom: 11173 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/25/2013 | Choke Size: | 34.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5774 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2013 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 742 | | BBLS_OIL | 241 | | BTU_GAS | 1300 | | CALC_BBLS_H2O | 742 | | CALC_BBLS_OIL | 241 | | CALC_GOR | 1278 | | CALC_MCF_GAS | 308 | | CASING_PRESS | 875 | | GRAVITY_OIL | 32 | | MCF_GAS | 308 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 6927 ft. | # Of Holes: | 612 | | Interval Bottom: | 11173 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 407 |
| Total Gas Produced (MCF) | 953 |
| GOR | 2341 |
| GOR Determination | BOE |
| Average BOE per Day | 1.565 |
| Average MCFE per Day | 9.081 |
| Federal Financial Assurance | i | |
|
|